NFPA 24 Test (TFM10) EXAM 2025/2026 ACTUAL COMPLETE REAL EXAM QUESTIONS
WITH ACCURATE ANSWERS (VERIFIED ANSWERS) | GET IT RIGHT!! 2025 BRAND NEW!!
Combined Service Mains - (answer)This standard shall apply to ______ intended to carry water for fire
service mains
AHJ - (answer)Working plans shall be submitted for approval to the _____ before any equipment is
installed or remodeled.
Pressure-Regulating devices - (answer)____ shall not be used
Control Valves - (answer)______ shall not be installed in the piping from the fire department connection
to the fire service main
Control Valves - (answer)_____ shall be permitted in the system downstream of the fire department
connection
Check Valve - (answer)When more than one water supply exists, a ___________ shall be installed in
each connection
Control Valve - (answer)All check valves shall have a ________ installed upstream and downstream of
the check valve.
40 ft - (answer)A post indicator valve installed not less than____ from the building
32-40 inches - (answer)Where post indicator valves are used, they shall be set so that the top of each
post is _______ above final grade
not be required - (answer)Supervision of underground gate valves with roadway boxes shall
____________
not be less than 6 inches - (answer)The connection from the hydrant to the main shall ___________
WITH ACCURATE ANSWERS (VERIFIED ANSWERS) | GET IT RIGHT!! 2025 BRAND NEW!!
Combined Service Mains - (answer)This standard shall apply to ______ intended to carry water for fire
service mains
AHJ - (answer)Working plans shall be submitted for approval to the _____ before any equipment is
installed or remodeled.
Pressure-Regulating devices - (answer)____ shall not be used
Control Valves - (answer)______ shall not be installed in the piping from the fire department connection
to the fire service main
Control Valves - (answer)_____ shall be permitted in the system downstream of the fire department
connection
Check Valve - (answer)When more than one water supply exists, a ___________ shall be installed in
each connection
Control Valve - (answer)All check valves shall have a ________ installed upstream and downstream of
the check valve.
40 ft - (answer)A post indicator valve installed not less than____ from the building
32-40 inches - (answer)Where post indicator valves are used, they shall be set so that the top of each
post is _______ above final grade
not be required - (answer)Supervision of underground gate valves with roadway boxes shall
____________
not be less than 6 inches - (answer)The connection from the hydrant to the main shall ___________