The PMP Certification Questions & Answers 2025 (Latest Test Edition) provides over 100% verified exam questions with detailed explanations and rationales. Designed to help candidates prepare effectively, this A+ graded resource covers all domains tested in the PMP exam. With updated, accurate content, it ensures exam readiness, boosts confidence, and maximizes your chances of success on the first attempt.

Meer zien Lees minder
Instelling
PMP Certification
Vak
PMP Certification











Oeps! We kunnen je document nu niet laden. Probeer het nog eens of neem contact op met support.

Geschreven voor

Instelling
PMP Certification
Vak
PMP Certification

Documentinformatie

Geüpload op
23 augustus 2025
Aantal pagina's
1184
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

Voorbeeld van de inhoud

2024 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel!

PMP Certification Questions & 100%
Correct Answers and Exaplanations-
Latest Test | Graded A+ | Passed
A project team is in the process of estimating the types and quantities of

resources required to perform each activity. Which of the following activities will

NOT be done by the team during this process?


A. Estimate the type and quantity of resource required to perform each activity


B. Go through the past data and lessons learned from previous projects


C. Study the organization policies and procedures regarding staffing


D. Identify and show network dependency in the project activities


 -:- Correct Option: D




EXPLANATION




The project team is in the process of Estimating Activity Resources, and the

activities provided as options (b) and (c) are done as part of this process. Option

(d), which involves creating a schedule network diagram to display project

schedule activities and logical relationship between them, is part of the Sequence

Activities process.




1|Page | Grade A+| 2024/2025

,2024 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel!
During the initiating stage, which of the following elements will be identified to

meet the project goals?


A. Key deliverable


B. Stakeholders


C. Quality


D. Vendors


 -:- Correct Option: A




EXPLANATION




Even though the identification of stakeholders and potential sellers happens as

part of initiating phase through the "identify stakeholders" process, this will not

help to meet the project goals. Key deliverables help in meeting the project goals.

Quality identification happens during planning.




A car manufacturing company conceptualized a new car that will be more fuel

efficient, ergonomically designed, and that satisfies the latest safety regulations.

This car was recently launched and has now moved into full-fledged production.

This is an example of:


A. Operation, as the company is into car manufacturing, which is an ongoing process


B. Project, as this car was conceptualized, designed, and has now been launched

2|Page | Grade A+| 2024/2025

,2024 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel!
C. Project, as it has clear scope and requirements in terms of safety

compliance, fuel efficiency, etc.


D. Operation, as this activity didn't create a unique product


 -:- Correct Option: B




EXPLANATION




This is a typical scenario where project intersects with operation during product

life cycle. Notice the word launched. All the activities before launch of the vehicle

are part of a project, which is a temporary activity with a well-defined unique

output. Once the car moves to production, it becomes an ongoing operation for

the company.




When is the cost highest in the project life cycle?


A. At the initiating phase


B. During planning


C. Midway during the project


D. During closure


 -:- Correct Option: C




3|Page | Grade A+| 2024/2025

, 2024 / 2 0 2 5 | © copyright | This work may not be copied for profit gain | Excel!
EXPLANATION




Project cost peaks in the middle of the project as maximum resources are utilized

during this phase. Project cost is low at the beginning, peaks midway, and drops

rapidly as the project draws to an end. Initiating, planning, and closing are not

part of the project life cycle and are process groups.




As a part of Stakeholder Management, a Project Manager can follow all of these

management practices, EXCEPT:


A. Identify all the stakeholders and capture them in the project team directory


B. Ensure that stakeholders' expectations are met and gain support for the project


C. Give preference to stakeholders over customers in case of conflict of interest


D. Communicate all relevant information about the project to stakeholders


 -:- Correct Option: C




EXPLANATION




In case of conflict of interest, it should generally be resolved in favor of the

customer or organization who would use the project's product or service.



4|Page | Grade A+| 2024/2025

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Dokkie247 California State University - East Bay
Bekijk profiel
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
171
Lid sinds
1 jaar
Aantal volgers
5
Documenten
874
Laatst verkocht
8 uur geleden
Dokkie247

Dokkie247 Test Banks and Practice Exams Struggling to find the perfect study materials? Welcome to Dokkie247! We specialize in delivering high-quality test banks, practice exams, and study resources to make exam prep stress-free and effective. Tip: Success doesn’t happen by chance. It happens by choice. Choose Dokkie247 Test Banks and Practice Exams! Study smart, not hard. Your success story starts here! Let’s make exam success your new normal.

Lees meer Lees minder
4.5

52 beoordelingen

5
41
4
4
3
3
2
0
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Veelgestelde vragen