Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

COSC 354 exam 2 Questions and Answers Fully Solved Latest Version

Document preview thumbnail
Preview 1 out of 4 pages

COSC 354 exam 2 Questions and Answers Fully Solved Latest Version What material does the ironworker typically use during steel erection to temporarily hold the steel in-place until bolts can be installed? - Answers Drift Pins In a two-way floor/roof system, the heavy reinforcement that is designed to carry the higher bending forces encountered in the zones of the slab that cross the columns is called what? In class, it was described as a "Grade beam within the depth of the slab". - Answers Column Strip In a two-way flat slab, the mushroom capital or the drop panels are built to resist what in the structure? - Answers High Shear Forces at the top of the column How does weathering steel differ from conventional carbon steel in construction? - Answers Its unique composition allows it to develop a protective layer of rust, which eliminates the need for painting and provides enhanced corrosion resistance over time When performing a weld, air needs to be kept out of the weld to keep from rapid oxidation. This is mostly commonly resolved by: - Answers Gaseous Shield Similar to a one-way joist system, this type of one-way floor system allows for longer span joists because of a thickened slab section: - Answers Skip-Joist System What distinguishes ferrous metals based on their carbon content? - Answers Their carbon content predominantly determines their mechanical properties, such as strength and hardness A flag at the tangent of the reference line and arrow means____________ - Answers Field Weld A circle at the tangent of the arrow and the reference line means welding to be: - Answers Correct answer: All Around While elevated concrete is curing these temporary props are installed to relieve the loads until the concrete has met its desired strength: - Answers Reshoring As discussed in class, at what temperature does steel rapidly lose its yield strength? - Answers 500-600 degrees When making column splices on multi-story buildings, where is the splice usually made? - Answers Wait Height Above the Floor When discussing the ways to stabilize a building horizontally from lateral forces, i.e wind, the method that uses solid walls of concrete, or concrete masonry is called: - Answers Shear Walls When a beam connection needs to be made to a girder, and the top side of the steel members need to be the same height, what is it called when the flange of the beam is cut? - Answers Coped Beam What structural steel member did the Wide Flange Beam replace because it is much more structural efficient? Also known as the I-beam. - Answers American Standard Beam These type of bolts are typically used as a temporary means of steel installation. These are also used in light framing scenarios: - Answers Carbon Steel Bolts Before steel goes through the rolling mills, the steel is fabricated into standard shapes that are typically thick approximations of their final shape. What is the steel called at this step? - Answers Beam Blanks What is true about using Insulated Concrete Forms (ICFs) in construction projects? - Answers Include enhanced energy efficiency, superior sound insulation, increased strength and durability, and accelerated construction timelines

Content preview

COSC 354 exam 2 Questions and Answers Fully Solved Latest Version 2025-2026

What material does the ironworker typically use during steel erection to temporarily hold the
steel in-place until bolts can be installed? - Answers Drift Pins

In a two-way floor/roof system, the heavy reinforcement that is designed to carry the higher
bending forces encountered in the zones of the slab that cross the columns is called what? In
class, it was described as a "Grade beam within the depth of the slab". - Answers Column Strip

In a two-way flat slab, the mushroom capital or the drop panels are built to resist what in the
structure? - Answers High Shear Forces at the top of the column

How does weathering steel differ from conventional carbon steel in construction? - Answers Its
unique composition allows it to develop a protective layer of rust, which eliminates the need for
painting and provides enhanced corrosion resistance over time

When performing a weld, air needs to be kept out of the weld to keep from rapid oxidation. This
is mostly commonly resolved by: - Answers Gaseous Shield

Similar to a one-way joist system, this type of one-way floor system allows for longer span joists
because of a thickened slab section: - Answers Skip-Joist System

What distinguishes ferrous metals based on their carbon content? - Answers Their carbon
content predominantly determines their mechanical properties, such as strength and hardness

A flag at the tangent of the reference line and arrow means____________ - Answers Field Weld

A circle at the tangent of the arrow and the reference line means welding to be: - Answers
Correct answer:

All Around

While elevated concrete is curing these temporary props are installed to relieve the loads until
the concrete has met its desired strength: - Answers Reshoring

As discussed in class, at what temperature does steel rapidly lose its yield strength? - Answers
500-600 degrees

When making column splices on multi-story buildings, where is the splice usually made? -
Answers Wait Height Above the Floor

When discussing the ways to stabilize a building horizontally from lateral forces, i.e wind, the
method that uses solid walls of concrete, or concrete masonry is called: - Answers Shear Walls

When a beam connection needs to be made to a girder, and the top side of the steel members
need to be the same height, what is it called when the flange of the beam is cut? - Answers
Coped Beam

Document information

Uploaded on
August 20, 2025
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh
3.5
(76)
Sold
493
Followers
16
Items
32839
Last sold
3 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions