Three - accurate answers-The mechanical provisions of the international
residential code are applicable to one and two family dwellings and
townhouses a maximum of________________stories above grade plane in height.
Specifically adopted - accurate answers-Provisions of an appendix do not
apply unless_______________.
Specific - accurate answers-Where there is a conflict between a general code
requirement and a specific requirement, the_______________requirement shall
govern.
Owner or owners agent - accurate answers-The_________________shall be
responsible for the maintenance of the mechanical system.
The code official - accurate answers-When requirements necessary for proper
operation of a proposed mechanical system are not specifically covered by the
code, such requirements shall be determined by____________________.
State the reason for disapproval in writing to the applicant - accurate
answers-Where the code official finds that a proposed alternative material
does not comply with the intent of the code provisions, the code official shall
_________________.
Interpret - accurate answers-The code official has the authority
to______________the provisions of the code.
For individual cases where the strict letter of the code is impractical - accurate
answers-The code official has the authority to grant modifications to the
code________________.
Economics - accurate answers-In order for an alternative material, design or
method of construction to be considered acceptable, it must be equivalent to
the code based on all but which of the following criteria?
, An approved agency - accurate answers-Tests performed
by_________________may be required by the code official where there is
insufficient evidence of code compliance.
Elements have been reconditioned, placed in proper working order and
approved - accurate answers-Used materials, equipment and appliances may
be utilized under which of the following conditions?
Required by state law - accurate answers-The code official shall require
construction documents and specifications to be prepared by a registered
design professional when____________.
An annual permit may be issued - accurate answers-In the case of an
approved existing mechanical system in a factory with qualified
personnel,_______________for periodic alterations to the system.
One year - accurate answers-Once a permit has expired because the
authorized work was not commenced or was suspended\abandoned, a new
permit may be issued at one-half the amount required for a new permit,
provided the work has not been abandoned for more than________________.
Approved - accurate answers-When the building permit is issued, the
construction documents shall be stamped________________.
At the job site - accurate answers-One set of construction documents shall be
kept_______________until completion of the project.
Is unexpired - accurate answers-A person holding a permit has the right to
apply for an extension, provided the permit________________.
Holder of the permit - accurate answers-The______________shall be responsible
for the scheduling of inspections.
Clean backfill - accurate answers-At an underground inspection where the
excavated soil contains rocks, broken concrete or rubble,_________________is
required on the job site.
Accurate Answers
Three - accurate answers-The mechanical provisions of the international
residential code are applicable to one and two family dwellings and
townhouses a maximum of________________stories above grade plane in height.
Specifically adopted - accurate answers-Provisions of an appendix do not
apply unless_______________.
Specific - accurate answers-Where there is a conflict between a general code
requirement and a specific requirement, the_______________requirement shall
govern.
Owner or owners agent - accurate answers-The_________________shall be
responsible for the maintenance of the mechanical system.
The code official - accurate answers-When requirements necessary for proper
operation of a proposed mechanical system are not specifically covered by the
code, such requirements shall be determined by____________________.
State the reason for disapproval in writing to the applicant - accurate
answers-Where the code official finds that a proposed alternative material
does not comply with the intent of the code provisions, the code official shall
_________________.
Interpret - accurate answers-The code official has the authority
to______________the provisions of the code.
For individual cases where the strict letter of the code is impractical - accurate
answers-The code official has the authority to grant modifications to the
code________________.
Economics - accurate answers-In order for an alternative material, design or
method of construction to be considered acceptable, it must be equivalent to
the code based on all but which of the following criteria?
, An approved agency - accurate answers-Tests performed
by_________________may be required by the code official where there is
insufficient evidence of code compliance.
Elements have been reconditioned, placed in proper working order and
approved - accurate answers-Used materials, equipment and appliances may
be utilized under which of the following conditions?
Required by state law - accurate answers-The code official shall require
construction documents and specifications to be prepared by a registered
design professional when____________.
An annual permit may be issued - accurate answers-In the case of an
approved existing mechanical system in a factory with qualified
personnel,_______________for periodic alterations to the system.
One year - accurate answers-Once a permit has expired because the
authorized work was not commenced or was suspended\abandoned, a new
permit may be issued at one-half the amount required for a new permit,
provided the work has not been abandoned for more than________________.
Approved - accurate answers-When the building permit is issued, the
construction documents shall be stamped________________.
At the job site - accurate answers-One set of construction documents shall be
kept_______________until completion of the project.
Is unexpired - accurate answers-A person holding a permit has the right to
apply for an extension, provided the permit________________.
Holder of the permit - accurate answers-The______________shall be responsible
for the scheduling of inspections.
Clean backfill - accurate answers-At an underground inspection where the
excavated soil contains rocks, broken concrete or rubble,_________________is
required on the job site.