Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Document preview thumbnail
Voorbeeld 2 van de 15 pagina's
Tentamen (uitwerkingen)

CIT 492 Final Exam [ACTUAL EXAM] LATEST VERSION [QUESTIONS AND ANSWERS] WITH PRACTICE EXAM DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST UPDATE 2025 GRADED A (BRAND NEW!!)

Document preview thumbnail
Voorbeeld 2 van de 15 pagina's

CIT 492 Final Exam [ACTUAL EXAM] LATEST VERSION [QUESTIONS AND ANSWERS] WITH PRACTICE EXAM DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST UPDATE 2025 GRADED A (BRAND NEW!!)

Voorbeeld van de inhoud

CIT 492 Final Exam [ACTUAL EXAM] LATEST VERSION
[QUESTIONS AND ANSWERS] WITH PRACTICE EXAM
DETAILED AND VERIFIED FOR GUARANTEED PASS- LATEST
UPDATE 2025 GRADED A (BRAND NEW!!)


Use the Gantt chart and the activity list to determine when resource 5 is free.
ActivityResourcesActivityResourcesA1F1B5G2C4H5D3J3E2K4 - ✔✔✔✔✔ Between
45 and 60

The AOA network described by this table needs:
ActivityPredecessorA--B--CA, BDBEC, D - ✔✔✔✔✔ One dummy activity.

Use the network diagram and activity lengths in the nodes to determine the late finish
time for activity C. - ✔✔✔✔✔ 14

The process of accelerating a project is referred to as: - ✔✔✔✔✔ Crashing

Activities C, D, and E in the project represented by the network are to be hammocked.
What are the early start and late finish times of the hammock activity? - ✔✔✔✔✔ 6, 26

A project has the precedence requirements and activity durations shown in the table.
After he draws the network, the project manager decides that activities H and I can be
represented by a hammock activity. What are the early start and late finish times
associated with this hammock activity?TimePredecessorA7
B8AC13BD8CE7AF6EG6AH11GI12HJ14D, F, I - ✔✔✔✔✔ 13, 36

Use the network diagram and activity lengths in the nodes to determine the early start
time for activity D. - ✔✔✔✔✔ 14

In general, the better candidates for shortening are: - ✔✔✔✔✔ Early tasks opposed to
later tasks.

Which of the activities in the diagram have slack? - ✔✔✔✔✔ B and D

What information is NOT included in the nodes for an AOA network? - ✔✔✔✔✔ Early
Finish Time

, What is the late start time for Activity E given the activity times and precedence
requirements shown in the table?
ActivityTimePredecessorA5--B7--C8AD7AE4BF8C, DG9E, FH7G - ✔✔✔✔✔ 17

It costs $75 per day for each day that a construction crew is on site. The project
manager determines that most activities can be crashed and has listed the crashing
costs next to the minimum time for each activity. Use this information to determine the
lowest cost for this project. All times given are in days.ActivityNormal TimeMinimum
TimeCrash Cost ($/day)PredecessorA106$70--B63$40--C22--
BD42$60CE64$80AF85$90D, E - ✔✔✔✔✔ $1,780

Use the network diagram and activity lengths in the nodes to determine the early finish
time for activity G. - ✔✔✔✔✔ 26

Use the Gantt chart and activity list to determine when resource 3 is free.
ActivityResourcesActivityResourcesR3M1H1K5G4J3F2P1B2S2T4W3 - ✔✔✔✔✔
Between 10 and 20

Use the Gantt chart and activity list to determine which resource has the greatest
continual use.
ActivityResourcesActivityResourcesR5M1H1K5G5J3F2P1B2S2T4W3 - ✔✔✔✔✔
Resource 5

Use the information in the table to determine the late finish time for Activity B.
TaskPredecessorDurationEarly StartEarly FinishLate StartLate FinishA--8BA14CA238
DC, B62326EC32FD, E3238 - ✔✔✔✔✔ Day 26

Hammock activities allow: - ✔✔✔✔✔ The project team to better disaggregate the
overall project network into logical summaries.

An activity has an optimistic time estimate of 17 days, a most likely estimate of 22 days,
and a pessimistic estimate of 32 days. What is the expected duration of the activity? -
✔✔✔✔✔ 22.83 Days

Which technique would accelerate the completion of a project? - ✔✔✔✔✔ Laddering

Summaries for some subsets of the activities identified in the overall project network are
called: - ✔✔✔✔✔ Hammock Activities

These can be located by doing a backward pass through a network. - ✔✔✔✔✔ Burst
Activities

Concurrent activities are: - ✔✔✔✔✔ Activities that can be performed at the same time

Documentinformatie

Geüpload op
16 augustus 2025
Aantal pagina's
15
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden
$18.39

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
CornelWest
3.7
(259)
Verkocht
1626
Volgers
1128
Items
12883
Laatst verkocht
10 uur geleden



Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen