Exam (elaborations)

AFSB 152 Practice Exam ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTION GUIDE) (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025

Document preview thumbnail
Preview 3 out of 29 pages

AFSB 152 Practice Exam ACTUAL EXAM QUESTIONS WITH COMPLETE SOLUTION GUIDE) (MULTIPLE CHOICES) (A+ GRADED 100% VERIFIED) LATEST VERSION 2025

Content preview

AFSB 152 Practice Exam ACTUAL EXAM QUESTIONS
WITH COMPLETE SOLUTION GUIDE) (MULTIPLE
CHOICES) (A+ GRADED 100% VERIFIED) LATEST
VERSION 2025
Contractor A submits a bid of $800,000, Contractor B submits $1 million,
Contractor C submits $1.2 million, and Contractor D submits $1.1 million. Which
one of the following explains the outcome of applying the 10 percent rule for
bids?



A. Because the next highest bid ($1 million) is 25 percent more than the low bid
($800,000), which is greater than a 10 percent difference, the bond underwriter
would carefully investigate the differences and may not issue the performance
and payment bonds.



B. Because the difference between the high and low bids is 50 percent more than
the low bid of $800,000, which is greater than a 10 percent difference, the bond
underwriter would probably decline to issue the performance and payment
bonds.



C. Because the average of the next two highest bids is 1.05 million, and the
difference between this amount and the low bid is 31.25 percent more than the
low bid of $800,000, which is greate - (ANSWER)A. Because the next highest bid
($1 million) is 25 percent more than the low bid ($800,000), which is greater than
a 10 percent difference, the bond underwriter would carefully investigate the
differences and may not issue the performance and payment bonds.



Which one of the following is true regarding types of contact status reports?

,Select one:

A. As comprehensive reports contain cumulative data, analyzing a series of
reports is not necessary.



B. Only the comprehensive report can prove useful in establishing billing-cost-
gross profit relationships.



C. Both basic and comprehensive reports provide a complete financial profile.



D. A basic status report shows specific and limited data for a contract. -
(ANSWER)D. A basic status report shows specific and limited data for a contract.



Samuel has been asked to underwrite a contract bond for an entity operating in
the U.S. that has an international parent. He is only willing to write the bond
through a cooperative underwriting agreement, with indemnity agreements from
the foreign parent and the U.S. entity. Under this arrangement, it is important
that the indemnification be perfected and enforceable under the laws of



A. The state where the project owner is located.

B. The location of the project.

C. The state where the U.S. entity is located.

D. The parent company's domicile. - (ANSWER)D. The parent company's domicile.

, Which one of the following describes a problem a project owner could encounter
when using a design/build contractor?



A. Government requirements may require a seal on the plans from a professional
engineer or a registered architect, and the design/build contractor may not have a
designer on staff.



B. The design/build contractor charges a separate design fee in addition to the
construction overhead and profit, so the overall project cost may be high.



C. Increased planning time should be allotted in the project for communication
among design professionals, contractors, and the project owner.



D. The design/build contractor has no experience with or knowledge of the costs
associated with various construction techniques and materials. - (ANSWER)A.
Government requirements may require a seal on the plans from a professional
engineer or a registered architect, and the design/build contractor may not have a
designer on staff.



The party that directly benefits from an enhanced competitive position in private
work because of the surety's assurance that its capacity to perform has been
carefully reviewed is the



A. Taxpayers.

B. Contractor.

Document information

Uploaded on
August 16, 2025
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Examinor
4.9
(529)
Sold
8189
Followers
7
Items
3318
Last sold
20 hours ago


Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions