In the previous year, a company had revenues of $500,000, project overhead of $40,000 and company overhead of $75,000. The company expects the percentage for project and company overhead to remain the same for the current year. The company desires to make a 10% profit on a project it is bidding. The project would have $80,000 in direct costs. What should the bid price be? - Answer Between $110,000 and $120,000 Which of the following is considered ethical behavior? - Answer Failing to disclose one subcontractor's bid to another Where would the most specific information about the size and location of windows be found in a set of construction drawings? - Answer in the window schedule

Content preview

PSI Practice Test Complete Version with
Verified Solutions
In the previous year, a company had revenues of $500,000, project overhead of $40,000 and company
overhead of $75,000. The company expects the percentage for project and company overhead to
remain the same for the current year. The company desires to make a 10% profit on a project it is
bidding. The project would have $80,000 in direct costs. What should the bid price be? - Answer
Between $110,000 and $120,000



Which of the following is considered ethical behavior? - Answer Failing to disclose one subcontractor's
bid to another



Where would the most specific information about the size and location of windows be found in a set of
construction drawings? - Answer in the window schedule



What is the maximum depth for a K-Series open web steel joist? - Answer 30 inches



What is the minimum depth of a trench excavation in which a ladder is required to be provided? -
Answer 4 feet



Before excavating for a new building, how should subsoil conditions be determined? - Answer
conducting test borings



For roofing work, what is the minimum distance that materials and equipment can be stored from a roof
edge without a guardrail being required - Answer 6 feet



Which designation is used by the Steel Joist Institute's Standard Specification to designate short span
steel bar joists? - Answer K-Series



Which of the following would typically be covered by a contractor's comprehensive general liability
insurance policy? - Answer Damage to adjoining property from a crane accident.

, What is the approximate optimum hourly production rate for a wheeled backhoe filling hauling units?
Struck capacity for the bucket is 6 loose cubic feet and the bucket fill factor is 110%. The cycle time is 2
minutes, the soil type is moist loam with a 25% swell factor. - Answer 6 BCY



What is the minimum requirement for the placement of each tie in a block wall used with wood
framing? - Answer 2 2/3 square feet



In general, what is the MINIMUM concrete covering for steel reinforcement in a footing? - Answer 3.0
inches



What is the maximum allowable slope for an excavation in Type B soil? - Answer 45 degrees



An employee earns $12.50 per hour. What is the gross pay of this non-exempt employee who works 45
hours during a holiday week, and receives 8 hours additional pay for the holiday? - Answer $693.75



How many inches should there be between a handrail and an adjacent wall? - Answer 1 1/2 inches



Costs that relate to construction but are not directly associated with labor and materials for a specific
project are considered to be which of the following? - Answer project overhead



Who oversees compliance with Material Safety Data Sheets? - Answer OSHA



Which of the following statements about a sole proprietorship is TRUE? - Answer The business, or any
part of it, can be sold, altered, or exchanged at will



AT LEAST how often should employees watch for possible hazards at the jobsite? - Answer Constantly



What is the minimum allowable slope of the ground that is immediately adjacent to a foundation wall? -
Answer 5%



Which is true about the placement of flexible insulation batts located in floor joists above an unheated
crawl space? - Answer They should be well supported between joists

Document information

Uploaded on
August 15, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Topscore101
5.0
(1)
Sold
7
Followers
0
Items
1884
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions