Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Radon Mitigation Exam Questions and Answers Already Passed

Document preview thumbnail
Preview 3 out of 18 pages

Radon Mitigation Exam Questions and Answers Already Passed Simultaneously deployed radon measurements were conducted in the basement and first floor. The first floor measurement was more than two times higher than the measurement taken in the basement. What could cause this? - AnswersRadon being released from higher water usage on the first floor What would be the most appropriate location for the discharge point of an active soil depressurization system? - AnswersNot Less than 10 feet above grade What radon entry mechanism typically causes the greatest amount of radon entry in homes? - AnswersRadon soil gases drawn into the home because the air pressure inside is lower than the air pressure in the soil Air always moves from _____ pressure to ___ pressure. - Answershigher to lower The greatest health risk from radon generally comes from: - AnswersAlpha particles released from decay products attached to lung tissue According to standards, how far above a pitched roof must the exhaust extend above the point penetrated? - AnswersNot less than 1 foot According to standards, when the ASD piping is attached to the side of a building, how far above the edge of the roof must the exhaust extend? - AnswersNot less than 6 inches above the edge of the roof After a mitigation system has been installed and activated, what is the minimum waiting time before beginning a post-mit test? - Answers24 hours When is the ASD discharge point allowed to be below the roof? (3 rules) - Answers1. Not able to comply with above the roof requirements 2. Point of exhaust is not less than 20 ft. above grade nearest to the exhaust 3.Radon test is performed in the nearest occupiable area What material beneath a slab is likely to give you the best success with a sub-slab depressurization system? - AnswersClean aggregate After completing a mitigation system, you should inspect the system for compliance with what 3 things? - Answers1. ANSI_AARST Mitigation Standard 2.Conformance with the intended design criteria 3. local statutes and codes Prior to the installation of a building or airspace pressurization system, what must be performed to evaluate system capacity requirements? - AnswersPressure and airflow measurements (usually a blower door) Who is required to perform the pressure and airflow measurements prior to installing a building or airspace pressurization system? - AnswersQualified ventilation professional A single point sub-slab depressurization system has been installed. The radon was reduced, but not sufficiently below 4.0. Sub-slab pressures were negative except at a location furthest from the suction point. The system airflow in the 4-inch vent pipe was 145 cfm. What would be an appropiate action to take? - AnswersFind locations where excess air is entering the sub-grade and seal them. What is an example of a thermal by-pass? (4) - Answerspipe chase, duct chase, unsealed recessed lights, chimneys Standards allow for you to give a verbal job proposal? T or F - AnswersFalse. written proposal What is the minimum distance a measurement device should be placed from an exterior opening such as a window or door? - Answers3 feet a Sub-Slab Depressurization system was installed. The U-tube performance indicator showed a vacuum inside the suction piping below the fam of 0.6 inches of a water column. A few months later the vacuum has increased to 1.0 inches. What could cause this? - AnswersThe soil beneath the slab has become wet and is restricting air flow. A sub-slab depressurization system was installed The system performance indicator showed a vacuum inside the suction piping below the fan of 0.75 inches of water column. A few months later the vacuum has dropped to 0.2 inches. What could cause this? - Answersan obstruction in the discharge pipe. Besides the mitigators name, address, phone, what are the five items that the written job proposal must contain? - Answers-description of the proposed system -long term om&m plan for the proposed design -costs for initial post-mitigation test & option of 3rd- party testing -whether the contractor warrants that the system will or will not reduce the radon concentrations below a specified threshold -estimate of instillation costs & annual operating costs Why do mitigation professionals need to understand radon measurement protocols? - AnswersTests SHALL BE reviewed in developing an appropriate mitigation plan.

Content preview

Radon Mitigation Exam Questions and Answers Already Passed

Simultaneously deployed radon measurements were conducted in the basement and first floor.
The first floor measurement was more than two times higher than the measurement taken in
the basement. What could cause this? - AnswersRadon being released from higher water usage
on the first floor

What would be the most appropriate location for the discharge point of an active soil
depressurization system? - AnswersNot Less than 10 feet above grade

What radon entry mechanism typically causes the greatest amount of radon entry in homes? -
AnswersRadon soil gases drawn into the home because the air pressure inside is lower than the
air pressure in the soil

Air always moves from _____ pressure to ___ pressure. - Answershigher to lower

The greatest health risk from radon generally comes from: - AnswersAlpha particles released
from decay products attached to lung tissue

According to standards, how far above a pitched roof must the exhaust extend above the point
penetrated? - AnswersNot less than 1 foot

According to standards, when the ASD piping is attached to the side of a building, how far above
the edge of the roof must the exhaust extend? - AnswersNot less than 6 inches above the edge
of the roof

After a mitigation system has been installed and activated, what is the minimum waiting time
before beginning a post-mit test? - Answers24 hours

When is the ASD discharge point allowed to be below the roof? (3 rules) - Answers1. Not able to
comply with above the roof requirements

2. Point of exhaust is not less than 20 ft. above grade nearest to the exhaust

3.Radon test is performed in the nearest occupiable area

What material beneath a slab is likely to give you the best success with a sub-slab
depressurization system? - AnswersClean aggregate

After completing a mitigation system, you should inspect the system for compliance with what
3 things? - Answers1. ANSI_AARST Mitigation Standard

2.Conformance with the intended design criteria

3. local statutes and codes

Prior to the installation of a building or airspace pressurization system, what must be performed

,to evaluate system capacity requirements? - AnswersPressure and airflow measurements
(usually a blower door)

Who is required to perform the pressure and airflow measurements prior to installing a building
or airspace pressurization system? - AnswersQualified ventilation professional

A single point sub-slab depressurization system has been installed. The radon was reduced, but
not sufficiently below 4.0. Sub-slab pressures were negative except at a location furthest from
the suction point. The system airflow in the 4-inch vent pipe was 145 cfm. What would be an
appropiate action to take? - AnswersFind locations where excess air is entering the sub-grade
and seal them.

What is an example of a thermal by-pass? (4) - Answerspipe chase, duct chase, unsealed
recessed lights, chimneys

Standards allow for you to give a verbal job proposal? T or F - AnswersFalse. written proposal

What is the minimum distance a measurement device should be placed from an exterior
opening such as a window or door? - Answers3 feet

a Sub-Slab Depressurization system was installed. The U-tube performance indicator showed a
vacuum inside the suction piping below the fam of 0.6 inches of a water column. A few months
later the vacuum has increased to 1.0 inches. What could cause this? - AnswersThe soil beneath
the slab has become wet and is restricting air flow.

A sub-slab depressurization system was installed The system performance indicator showed a
vacuum inside the suction piping below the fan of 0.75 inches of water column. A few months
later the vacuum has dropped to 0.2 inches. What could cause this? - Answersan obstruction in
the discharge pipe.

Besides the mitigators name, address, phone, what are the five items that the written job
proposal must contain? - Answers-description of the proposed system

-long term om&m plan for the proposed design

-costs for initial post-mitigation test & option of 3rd- party testing

-whether the contractor warrants that the system will or will not reduce the radon
concentrations below a specified threshold

-estimate of instillation costs & annual operating costs

Why do mitigation professionals need to understand radon measurement protocols? -
AnswersTests SHALL BE reviewed in developing an appropriate mitigation plan.

What must happen before starting work if you are using sealants, caulks or bonding chemicals
containing volatile solvents? - Answersclient SHALL BE informed to ventilate the work area

, during AND after the work.

What affects the size needed of a suction pit for a sub-slab depressurization system? -
AnswersThe tighter the soil, the bigger pit you need

Why should a radon vent pipe slope back to the suction point? - AnswersTo prevent condensed
moisture from accumulating in the system

What method provides the greatest reduction in exposure to radon while conducting diagnostic
tests with a shop-vac? - Answersplace the shop-vac outside and run the suction hose into the
house

What would be the most effective way to treat an earthen crawl space beneath a home? -
AnswersLay a membrane in accordance with the standard on the crawlspace floor, seal to walls,
draw a vacuum from beneath it.

What must be readily available to the client upon request? - AnswersMaterial Safety Data Sheets
(SDS)q

What are the 5 appropriate mitigation design features that shall be considered on every job? -
Answers1. Practicality

2. Durability

3. Acceptable aesthetics

4. Ease of Service

5. Long Term Cost

What feature would cause great difficulty in employing a sub-slab depressurization system? -
AnswersA home with forced air furnace with return ducts are under the slab.

What best describes the requirements for post-mitigation testing, as described in the AARST
soil gas mitigation standard? - AnswersA short-term test no less than 48 hours in duration, with
the building under closed conditions, starting no earlier than 24 hours but no later than 30 days
after completing the system

Sump lids shall be identified with a label stating what? - Answers"Component of a Radon
Reduction System." Recommended to Do not tamper with or disconnect.

The ANSI-AARST mitigation standard does not recommend caulking and sealing alone to
mitigate radon because: - AnswersIt has not been shown to lower radon levels significantly or
consistently.

According to the ANSI-AARST mitigation standards, the pre-mitigation building investigation is
to include as a minimum: - AnswersSketch of building foundation and indication of system

Document information

Uploaded on
August 10, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
joshuawesonga22
3.4
(13)
Sold
115
Followers
2
Items
15049
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions