• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 30 pages
Exam (elaborations)

NETTCP Concrete Inspector Questions with Detailed Verified Answers

Document preview thumbnail
Preview 3 out of 30 pages

NETTCP Concrete Inspector Questions with Detailed Verified Answers

Content preview

Page | 1


NETTCP Concrete Inspector Questions with
Detailed Verified Answers

Quality assurance is defined as only those planned and systematic
actions taken by the agency to provide confidence that a product or
facility will perform satisfactorily in service. (1-1)

⼀Answer:- False

A quality assurance program serves as a skeleton or overall
framework necessary for construction quality assurance
implementation. (1-4)

⼀Answer:- True

Joint development and review of quality assurance specifications
should include agency and industry personnel (engineers,
inspectors, technicians) who are directly responsible for
construction. (1-5)

⼀Answer:- True

The same six core elements required for design-bid-build
construction QA programs are also required for design-build
construction QA programs. (1-8)

⼀Answer:- True

Quality control activities include only sampling and testing. Visual
inspection is relegated to the acceptance inspector. (1-10)

⼀Answer:- False

, Page | 2

Quality control plans are project specific documents whose
function is to address specific production facility and field
placement processes for individual categories of work on a
construction project. (1-11)

⼀Answer:- True

Acceptance is the responsibility of the transportation agency. (1-
12)

⼀Answer:- True

The engineering limits are the absolute threshold values for
individual test results (1-15)

⼀Answer:- True

Quality assurance specifications typically use quality measures.
(1-14)

⼀Answer:- True

Since the objective of the IA comparison is to identify discrepancies
or variability in testing procedures or equipment, IA testing is
performed on split samples. (1-20)

⼀Answer:- True

If Contractor QC test results are not utilized in the acceptance
decision, a dispute resolution system is not required. (1-21)

⼀Answer:- True

All Agency Central Laboratories are required under federal
regulations to be accredited through AASHTO Accreditation
Program (AAP). (1-23)

, Page | 3

⼀Answer:- True

Personal Qualification/Certification programs should include
requirements for re-certification at 2 to 5 year intervals. (1-26)

⼀Answer:- True

Each Agency Construction QA Program must meet the
requirements of 23 CFR 637B and is required to be approved by
FHWA. (1-27)

⼀Answer:- True

The process of hydration begins immediately when the cement
comes in contact with water. (2-1)

⼀Answer:- True

The cement paste density and strength are related. (2-1)

⼀Answer:- True

AASHTO M 85 (ASTM C 150) stipulate cement types based on
chemical composition. (2-3)

⼀Answer:- True

Type III cement is known as a low heat of hydration cement. (2-3)

⼀Answer:- False

According to ACI 318, mixtures using Type I cement should be
cured for 7 days. (2-4)

Document information

Uploaded on
August 9, 2025
Number of pages
30
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Passit
3.5
(23)
Sold
134
Followers
6
Items
14482
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions