Page | 1
Nettcp Training Questions with Detailed
Verified Answers
Quality assurance is defined as
⼀Answer:- plans or action taken by an agency that provides
confidence that a product or service with be satisfactory/adequate
I-15
A Quality Assurance program serves as
⼀Answer:- the framework necessary for construction Quality
Assurance implementation
I-18
The making and revision of QA specs should include...
⼀Answer:- agency and industry personnel (engineers, inspectors,
technicians)
I-19
The 6 elements used in "design bid build" QA programs are the
same as "Design build" construction QA programs
⼀Answer:- True
I-22
Quality control activities include...
, Page | 2
⼀Answer:- Sampling, testing and visual inspection
I-24
QC plans ...
⼀Answer:- -are Project Specific
- Address specific processes for individual categories of work on a
construction process
I-25
Acceptance is the responsibility of ...
⼀Answer:- the transportation agency
I-26
Engineering limits are ...
⼀Answer:- the absolute threshold values for individual test results
I-29
QA specs use
⼀Answer:- Quality measures
I-28
The purpose of IA is to...
, Page | 3
⼀Answer:- identify discrepancies or differences in testing
procedures or equipment
I-34
IA comparison is performed on ...
⼀Answer:- split samples
I-34
If contractor QC test results are not used in acceptance...
⼀Answer:- a dispute resolution system is not needed
I-35
All agency central labs are ...
⼀Answer:- required to be accredited through AASHTO
accreditation program AAP
Qualification/certification personnel should be...
⼀Answer:- required to re-cert every 2-5 yrs
I-40
Each agency construction QA program must meet
⼀Answer:- 23 CFR 637B and is required to be approved by FHWA
I-41
The D-3665 Random number table contains...
Nettcp Training Questions with Detailed
Verified Answers
Quality assurance is defined as
⼀Answer:- plans or action taken by an agency that provides
confidence that a product or service with be satisfactory/adequate
I-15
A Quality Assurance program serves as
⼀Answer:- the framework necessary for construction Quality
Assurance implementation
I-18
The making and revision of QA specs should include...
⼀Answer:- agency and industry personnel (engineers, inspectors,
technicians)
I-19
The 6 elements used in "design bid build" QA programs are the
same as "Design build" construction QA programs
⼀Answer:- True
I-22
Quality control activities include...
, Page | 2
⼀Answer:- Sampling, testing and visual inspection
I-24
QC plans ...
⼀Answer:- -are Project Specific
- Address specific processes for individual categories of work on a
construction process
I-25
Acceptance is the responsibility of ...
⼀Answer:- the transportation agency
I-26
Engineering limits are ...
⼀Answer:- the absolute threshold values for individual test results
I-29
QA specs use
⼀Answer:- Quality measures
I-28
The purpose of IA is to...
, Page | 3
⼀Answer:- identify discrepancies or differences in testing
procedures or equipment
I-34
IA comparison is performed on ...
⼀Answer:- split samples
I-34
If contractor QC test results are not used in acceptance...
⼀Answer:- a dispute resolution system is not needed
I-35
All agency central labs are ...
⼀Answer:- required to be accredited through AASHTO
accreditation program AAP
Qualification/certification personnel should be...
⼀Answer:- required to re-cert every 2-5 yrs
I-40
Each agency construction QA program must meet
⼀Answer:- 23 CFR 637B and is required to be approved by FHWA
I-41
The D-3665 Random number table contains...