Walmart / Sam's Safety, Employment, Waste,
Stormwater Compliance Certification
Save
Terms in this set (39)
The 1970's law that the Clean Water Act
regulated stormwater is:
Regulation outlining NPDES
stormwater management
on construction sites:
Never allowable discharge from contaminated groundwater
stormwater discharge
from a construction site:
When can the notice of all construction activity is complete and permanent
termination be filed? stabilization meets permit requirements
What must occur before submit the notice of termination (NOT)
construction starts for
stormwater permitting?
When must the after the SWPPP is prepared and before starting
stormwater notice of construction
intent (NOI) be
submitted?
Potential pollutant sources all of the above
on a construction site may
include:
https://quizlet.com/1064621545/walmart-sams-safety-employment-waste-stormwater-compliance-certification-flash-cards/?new 1/5
, 8/8/25, 6:03 PM Walmart / Sam's Safety, Employment, Waste, Stormwater Compliance Certification Flashcards | Quizlet
How can the SWPPP after consulting with the project SWPPP designer and
implementation sequence receiving written approval
be modified?
What is not shown on a Notices of Violation
SWPPP site map?
What information should all of the above
be posted at the site
entrance?
Which of the following is Flushing a spill down a storm drain
not a beneficial use of
water?
When installing and The low point (overflow) of the check dam is in the
maintaining a check dam, middle of the channel
what should you ensure?
How can you reduce the Install filter fabric under rock and similar placed within
possibility of undercutting the stormwater conveyance
in channels?
What must the good Post construction stormwater management
housekeeping section of procedures
the SWPPP include?
Which erosion control Vegetation
best management
practice increases water
infiltration?
Of the following factors Groundcover
that influence erosion
rates, which one can a
contractor control the
most?
When should temporary Immediately on all disturbed areas that are likely to or
stabilization be will remain inactive for 14-days or more
implemented?
https://quizlet.com/1064621545/walmart-sams-safety-employment-waste-stormwater-compliance-certification-flash-cards/?new 2/5