FDOT Asphalt Paving Level 1
Save
Practice questions for this set
Learn 1 /7 Study with Learn
Downstation
Choose an answer
When performing the straightedge
1 Stationing 2
procedure
3 S to N 4 Nuclear Gauges and PQIs are for
Don't know?
Terms in this set (72)
S to N Downstation
W to E Downstation
https://quizlet.com/1064557018/fdot-asphalt-paving-level-1-flash-cards/?new 1/8
, 8/8/25, 8:37 AM FDOT Asphalt Paving Level 1 Flashcards | Quizlet
Stationing Starts at 0+00
Stationing Measurement 1+00 is 100 feet
Measurement of Pavement smoothness with a 15 foot
Straight Edge is the
4.573 m rolling straightedge
Straight Edge is used to identify problems
Are random numbers generated usually by a VT for
Random sampling
cores to be extracted from the roadway
How often should you Calibrate at the start of each working period
calibrate a Straight edge
Using the manual straight Locate a flat area with the manual straightedge and
edge you find what kind place the rolling straightedge next to the manual
of spot to place the straightedge and the gauge should read 0
rolling straightedge?
The outside wheels to measure the low and the center
The 3/16 and the 3/8 shims
to measure the high. Gauge should read 3/16 on the
go under which wheels
3/16 shim and vice versa for the 3/8 shims. Make sure
during calibration
the center wheel moves up and down freely.
Rolling Straightedge
Manual Straightedge
Calibration materials for
Manual Measurement (ruler)
Straightedge
x4 3/16 shims 5mm thick
x4 3/8 shims 10mm thick
When to perform final After an entire lane has been paved
straightedge
When to perform final Pavement should be an ambient temperature
straightedge
You cannot use the calibrated
straightedge until it has
been properly
When performing the Maintain proper traffic management and safety
straightedge procedure
https://quizlet.com/1064557018/fdot-asphalt-paving-level-1-flash-cards/?new 2/8