• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 18 pages
Exam (elaborations)

Dbia Practice Test 2025/2026 Questions With Answers Graded A+

Document preview thumbnail
Preview 3 out of 18 pages

DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Content preview

DBIA PRACTICE TEST 2025/2026
QUESTIONS WITH ANSWERS GRADED A+



1. ProjectDeliverySystem:Howteammembersareorganized,establisheswhen parties
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




engage, determines roles of parties, and determines sequence of design,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




procurement, and construction (db, cmar, dbb)
,/ ,/ ,/ ,/ ,/ ,/




2. Procurement Method:howteammembers are selected (QBS, bestvalue,low ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




price, sole source)
,/ ,/ ,/




3. contractingapproach:how team membersare paid (fp,gmp, costreimburse- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




ment, target price, unit price)
,/ ,/ ,/ ,/ ,/




4. Design-Bid-Build(DBB):linear,sequential process, A/Eselected on qualifi- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




cations, GC selected on low price, design is fully completed without input from GC,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




A/E acting in owner's interests, with a historically strong bond, process is well-
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




established and understood ,/ ,/




5. construction manager at risk: similar org structure to DBB, construction man- ager ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




selectedbyQBSorbestvalue,contractorprovidespreconservices,negotiated gmp
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




contracting approach, open book estimating process, potential to fast track project,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




constructioncostdeterminedbeforedesigncompleted,potentialissuesover what is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




reasonably inferable from gmp design documents
,/ ,/ ,/ ,/ ,/ ,/




1/
,/g ,/g



18

,6. Design-Build:The owner contracts with one entity (a person or firm) to provide both ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




design and construction services, designer and contractor have a direct con- tractual
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




relationship, selected by QBS or best value, wide spectrum of contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




and organizational structures, single point responsibility, owner does not manage
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




designer, owner exposure to claims is significantly reduced
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




7. engineer procure construct (epc): similar to design build, in industrial and power
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




generation sectors, systems and performance testing are central to scope, contractor
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




will typically perform engineering with its in-house staff, owner has need for single point
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




responsibility, contracts include plant and process performance guarantees, contract
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




items include performance and schedule liquidated damages and limitations of liability
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




8. Multiple Prime Contracting: owner contracts with multiple trade contractors,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




attributesaretypically similarto dbb,owner'sabilityto scheduleand coordinatethe work
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




9. Integrated Project Delivery (IPD): multi-party agreement - all parties equal, QBS
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




procurementandtargetpricingcontractapproach,privatesectoruse(limitedatthis time),
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




key: owner's ability to accept risk
,/ ,/ ,/ ,/ ,/ ,/




10. public-private partnership (p3): Instead of government building and main- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




taining major infrastructure (such as highway, water treatment plant), build and
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




maintenanceisoutsourcedtoaprivatecompany.Opposedbypublicsectorunions. this is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




not considered a delivery system but its underlying approaches are delivery systems
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




and typically use DB. multiple procurement and contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/




2/ ,/g ,/g



18

, 11. shift left: intense efforts to establish scope early in the process; drives early team
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




formation to include key trade subcontractors;can enable big decisions to be made
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




early, affect project outcomes at lowest cost, establish a need for co-location and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




collaboration, and compress time during concurrent design and construction
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




12. traditionaldesignbuild:typicallytwo-phasebestvalueprocurementwithlump ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




sum contract; owner defines project requirements and scope of prescriptive work;
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




use of performance-based technical requirements with limited prescriptive specifi-
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




cations
,/g




13. progressive design build:design and price are progressively developed after the ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




design-builder is under contract;final project cost and schedule commitment is not
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




established as part of the selection process; two phases: preliminary services and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




final design and construction services
,/g ,/g ,/g ,/g ,/g




14. criteria documents: describe the end result ,/g ,/g ,/g ,/g ,/g




15. bridging documents:prescribes how to achieve the end result ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




16. design bid build paradigm: prior to bidding, owner undertakes a process to ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




design the project and all of its details to 100% complete plans and specs.the owner
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




is therefore responsible for success or failure of details of the design, and warrants
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




thesufficiencyofdesigntothecontractor.theowneristhereforeliabletothe contractorfor
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




anygapsbetweenplansandspecificationsandowner'srequirements for project
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




performance
,/g




17. design details responsibility: the owner should define its performance re- ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




quirements and award the contract on the basis of preliminary design;this makes
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




the design-builder responsible for completing the design in accordance with the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




owner'sperformance requirements.that also causes the design-builder to warrant the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




sufficiency of the design to meet the owner's criteria and the sufficiency of the design
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




to subcontractors/suppliers that have no design responsibility
,/g ,/g ,/g ,/g ,/g ,/g ,/g




18. uniformat: subdivides project by functional elements, focuses on systems and ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




assemblies, useful for preliminary information and early design phases, aligns with
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




BIM models and conceptual estimating
,/g ,/g ,/g ,/g ,/g




19. masterformat: subdividesworkbyresults/trades,focuseson buildingmaterials, ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




products, and activities, useful for detailed information during final design and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g




construction phases, and aligns with detailed estimating
,/g ,/g ,/g ,/g ,/g ,/g ,/g




3/ ,/g ,/g



18

Document information

Uploaded on
August 5, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TestBankPrep
4.9
(298)
Sold
65
Followers
7
Items
1269
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions