DBIA PRACTICE TEST 2025/2026
QUESTIONS WITH ANSWERS GRADED A+
1. ProjectDeliverySystem:Howteammembersareorganized,establisheswhen parties
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
engage, determines roles of parties, and determines sequence of design,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
procurement, and construction (db, cmar, dbb)
,/ ,/ ,/ ,/ ,/ ,/
2. Procurement Method:howteammembers are selected (QBS, bestvalue,low ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
price, sole source)
,/ ,/ ,/
3. contractingapproach:how team membersare paid (fp,gmp, costreimburse- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
ment, target price, unit price)
,/ ,/ ,/ ,/ ,/
4. Design-Bid-Build(DBB):linear,sequential process, A/Eselected on qualifi- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
cations, GC selected on low price, design is fully completed without input from GC,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
A/E acting in owner's interests, with a historically strong bond, process is well-
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
established and understood ,/ ,/
5. construction manager at risk: similar org structure to DBB, construction man- ager ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
selectedbyQBSorbestvalue,contractorprovidespreconservices,negotiated gmp
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
contracting approach, open book estimating process, potential to fast track project,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
constructioncostdeterminedbeforedesigncompleted,potentialissuesover what is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
reasonably inferable from gmp design documents
,/ ,/ ,/ ,/ ,/ ,/
1/
,/g ,/g
18
,6. Design-Build:The owner contracts with one entity (a person or firm) to provide both ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
design and construction services, designer and contractor have a direct con- tractual
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
relationship, selected by QBS or best value, wide spectrum of contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
and organizational structures, single point responsibility, owner does not manage
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
designer, owner exposure to claims is significantly reduced
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
7. engineer procure construct (epc): similar to design build, in industrial and power
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
generation sectors, systems and performance testing are central to scope, contractor
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
will typically perform engineering with its in-house staff, owner has need for single point
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
responsibility, contracts include plant and process performance guarantees, contract
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
items include performance and schedule liquidated damages and limitations of liability
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
8. Multiple Prime Contracting: owner contracts with multiple trade contractors,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
attributesaretypically similarto dbb,owner'sabilityto scheduleand coordinatethe work
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
9. Integrated Project Delivery (IPD): multi-party agreement - all parties equal, QBS
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
procurementandtargetpricingcontractapproach,privatesectoruse(limitedatthis time),
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
key: owner's ability to accept risk
,/ ,/ ,/ ,/ ,/ ,/
10. public-private partnership (p3): Instead of government building and main- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
taining major infrastructure (such as highway, water treatment plant), build and
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
maintenanceisoutsourcedtoaprivatecompany.Opposedbypublicsectorunions. this is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
not considered a delivery system but its underlying approaches are delivery systems
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
and typically use DB. multiple procurement and contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
2/ ,/g ,/g
18
, 11. shift left: intense efforts to establish scope early in the process; drives early team
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
formation to include key trade subcontractors;can enable big decisions to be made
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
early, affect project outcomes at lowest cost, establish a need for co-location and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
collaboration, and compress time during concurrent design and construction
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
12. traditionaldesignbuild:typicallytwo-phasebestvalueprocurementwithlump ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
sum contract; owner defines project requirements and scope of prescriptive work;
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
use of performance-based technical requirements with limited prescriptive specifi-
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
cations
,/g
13. progressive design build:design and price are progressively developed after the ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
design-builder is under contract;final project cost and schedule commitment is not
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
established as part of the selection process; two phases: preliminary services and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
final design and construction services
,/g ,/g ,/g ,/g ,/g
14. criteria documents: describe the end result ,/g ,/g ,/g ,/g ,/g
15. bridging documents:prescribes how to achieve the end result ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
16. design bid build paradigm: prior to bidding, owner undertakes a process to ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
design the project and all of its details to 100% complete plans and specs.the owner
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
is therefore responsible for success or failure of details of the design, and warrants
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
thesufficiencyofdesigntothecontractor.theowneristhereforeliabletothe contractorfor
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
anygapsbetweenplansandspecificationsandowner'srequirements for project
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
performance
,/g
17. design details responsibility: the owner should define its performance re- ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
quirements and award the contract on the basis of preliminary design;this makes
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
the design-builder responsible for completing the design in accordance with the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
owner'sperformance requirements.that also causes the design-builder to warrant the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
sufficiency of the design to meet the owner's criteria and the sufficiency of the design
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
to subcontractors/suppliers that have no design responsibility
,/g ,/g ,/g ,/g ,/g ,/g ,/g
18. uniformat: subdivides project by functional elements, focuses on systems and ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
assemblies, useful for preliminary information and early design phases, aligns with
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
BIM models and conceptual estimating
,/g ,/g ,/g ,/g ,/g
19. masterformat: subdividesworkbyresults/trades,focuseson buildingmaterials, ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
products, and activities, useful for detailed information during final design and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
construction phases, and aligns with detailed estimating
,/g ,/g ,/g ,/g ,/g ,/g ,/g
3/ ,/g ,/g
18
QUESTIONS WITH ANSWERS GRADED A+
1. ProjectDeliverySystem:Howteammembersareorganized,establisheswhen parties
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
engage, determines roles of parties, and determines sequence of design,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
procurement, and construction (db, cmar, dbb)
,/ ,/ ,/ ,/ ,/ ,/
2. Procurement Method:howteammembers are selected (QBS, bestvalue,low ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
price, sole source)
,/ ,/ ,/
3. contractingapproach:how team membersare paid (fp,gmp, costreimburse- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
ment, target price, unit price)
,/ ,/ ,/ ,/ ,/
4. Design-Bid-Build(DBB):linear,sequential process, A/Eselected on qualifi- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
cations, GC selected on low price, design is fully completed without input from GC,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
A/E acting in owner's interests, with a historically strong bond, process is well-
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
established and understood ,/ ,/
5. construction manager at risk: similar org structure to DBB, construction man- ager ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
selectedbyQBSorbestvalue,contractorprovidespreconservices,negotiated gmp
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
contracting approach, open book estimating process, potential to fast track project,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
constructioncostdeterminedbeforedesigncompleted,potentialissuesover what is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
reasonably inferable from gmp design documents
,/ ,/ ,/ ,/ ,/ ,/
1/
,/g ,/g
18
,6. Design-Build:The owner contracts with one entity (a person or firm) to provide both ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
design and construction services, designer and contractor have a direct con- tractual
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
relationship, selected by QBS or best value, wide spectrum of contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
and organizational structures, single point responsibility, owner does not manage
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
designer, owner exposure to claims is significantly reduced
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
7. engineer procure construct (epc): similar to design build, in industrial and power
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
generation sectors, systems and performance testing are central to scope, contractor
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
will typically perform engineering with its in-house staff, owner has need for single point
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
responsibility, contracts include plant and process performance guarantees, contract
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
items include performance and schedule liquidated damages and limitations of liability
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
8. Multiple Prime Contracting: owner contracts with multiple trade contractors,
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
attributesaretypically similarto dbb,owner'sabilityto scheduleand coordinatethe work
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
9. Integrated Project Delivery (IPD): multi-party agreement - all parties equal, QBS
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
procurementandtargetpricingcontractapproach,privatesectoruse(limitedatthis time),
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
key: owner's ability to accept risk
,/ ,/ ,/ ,/ ,/ ,/
10. public-private partnership (p3): Instead of government building and main- ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
taining major infrastructure (such as highway, water treatment plant), build and
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
maintenanceisoutsourcedtoaprivatecompany.Opposedbypublicsectorunions. this is
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
not considered a delivery system but its underlying approaches are delivery systems
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
and typically use DB. multiple procurement and contracting approaches
,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/ ,/
2/ ,/g ,/g
18
, 11. shift left: intense efforts to establish scope early in the process; drives early team
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
formation to include key trade subcontractors;can enable big decisions to be made
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
early, affect project outcomes at lowest cost, establish a need for co-location and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
collaboration, and compress time during concurrent design and construction
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
12. traditionaldesignbuild:typicallytwo-phasebestvalueprocurementwithlump ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
sum contract; owner defines project requirements and scope of prescriptive work;
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
use of performance-based technical requirements with limited prescriptive specifi-
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
cations
,/g
13. progressive design build:design and price are progressively developed after the ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
design-builder is under contract;final project cost and schedule commitment is not
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
established as part of the selection process; two phases: preliminary services and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
final design and construction services
,/g ,/g ,/g ,/g ,/g
14. criteria documents: describe the end result ,/g ,/g ,/g ,/g ,/g
15. bridging documents:prescribes how to achieve the end result ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
16. design bid build paradigm: prior to bidding, owner undertakes a process to ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
design the project and all of its details to 100% complete plans and specs.the owner
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
is therefore responsible for success or failure of details of the design, and warrants
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
thesufficiencyofdesigntothecontractor.theowneristhereforeliabletothe contractorfor
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
anygapsbetweenplansandspecificationsandowner'srequirements for project
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
performance
,/g
17. design details responsibility: the owner should define its performance re- ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
quirements and award the contract on the basis of preliminary design;this makes
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
the design-builder responsible for completing the design in accordance with the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
owner'sperformance requirements.that also causes the design-builder to warrant the
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
sufficiency of the design to meet the owner's criteria and the sufficiency of the design
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
to subcontractors/suppliers that have no design responsibility
,/g ,/g ,/g ,/g ,/g ,/g ,/g
18. uniformat: subdivides project by functional elements, focuses on systems and ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
assemblies, useful for preliminary information and early design phases, aligns with
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
BIM models and conceptual estimating
,/g ,/g ,/g ,/g ,/g
19. masterformat: subdividesworkbyresults/trades,focuseson buildingmaterials, ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
products, and activities, useful for detailed information during final design and
,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g ,/g
construction phases, and aligns with detailed estimating
,/g ,/g ,/g ,/g ,/g ,/g ,/g
3/ ,/g ,/g
18