Content preview

General crane safety ACTUAL exam: QUESTION AND
ANSWERS UPDATED 2025 LATEST
The minimum crane team for a mobile crane on outriggers would consist of-

A) The Crane Operator, Rigger Supervisor, and Crane Rigger

B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and

Crane Rigger

C) The Crane Operator, Crane Supervisor, and Crane Rigger

D) The Crane Operator and Rigger-in-Charge

E) The Crane Operator, Crane Walker, and Crane Rigger - (ANSWER)C) The Crane
Operator, Crane Supervisor, and Crane Rigger



When operating floating cranes, you must start swinging or rotating quickly and
stop smoothly to prevent excessive barge list.

A) True

B) False - (ANSWER)B) False



Extending a telescoping boom without lowering the hoist may result in "two-
blocking" the crane.

A) True

B) False - (ANSWER)A) True



All of the following require a license to operate EXCEPT a(n)-

A) Cab-operated category 3 bridge crane

,B) Mobile hydraulic truck crane

C) Non-cab operated category 3 bridge crane

D) Articulating boom category 4 crane

E) Floor-operated category 2 bridge crane - (ANSWER)C) Non-cab operated
category 3 bridge crane



Which of the following lift types would NOT be considered a complex lift?

A) Multiple-crane lifts

B) Oxygen/Acetylene bottles in racks designed for lifting

O C) Large geometric shapes

D) Loads with multi-level attachment points

E) Hazardous or explosive materials - (ANSWER)B) Oxygen/Acetylene bottles in
racks designed for lifting



What is the minimum amount of rope that shall be on a grooved drum and a
smooth drum?

A) There is no minimum

B) 4 full wraps, 2 full wraps

C) 2 full wraps, 3 full wraps

D) 6 full wraps, 4 full wraps

E) 1 full wrap, 2 full wraps - (ANSWER)B) 4 full wraps, 2 full wraps

,The horizontal distance from the center of rotation of the crane to the center of
the hoist line(s) with load applied is called

A) Boom Length

B) Radius

C) Lift Zone

D) Quadrant

E) Circumference - (ANSWER)B) Radius



What is two-blocking, and why is two-blocking dangerous?

A) Two-blocking occurs when the hook contacts another block or hook on the
crane. It is dangerous because the hook could damage the crane, causing loss of
load control.

B) Two-blocking occurs when the block or hook contacts the ground.

It is dangerous because the wire rope may come off of the drum and drop the
block.

C) Two-blocking occurs when the hook block comes in contact with the upper
sheave block during hoisting of the hook. It is dangerous because it could result in
damage to the crane, parting of the hoist lines, and dropping the load. -
(ANSWER)C) Two-blocking occurs when the hook block comes in contact with the
upper sheave block during hoisting of the hook. It is dangerous because it could
result in damage to the crane, parting of the hoist lines, and dropping the load.



When should a tagline be used during lifting operations?

A) when lifting a load over or near electrical transmission lines

B) to prevent the load from swinging or rotating

, C) when the supervisor approves their use

D) only when lifting the load to extreme heights - (ANSWER)B) to prevent the
load from swinging or rotating



What is the weight of a 24 square foot, 2 inch thick aluminum plate with a unit
weight of 15 lbs. per square foot of material per inch of thickness?

A) 348 pounds

B) 720 pounds

C) 6,720 pounds

D) 60 pounds

E) 120 pounds - (ANSWER)B) 720 pounds



The two expiration dates that are of particular importance to crane operators are-

A) Vehicle registration expiration date

B) Hydraulic oil expiration date

C) CAC card expiration date

D) The certification expiration date of the crane

E) The crane operator's license expiration date - (ANSWER)D) The certification
expiration date of the crane

E) The crane operator's license expiration date



Which of the following is NOT an acceptable method of communication between
the signal person and the crane operator?

Document information

Uploaded on
August 3, 2025
Number of pages
43
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$23.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Examinor
4.9
(530)
Sold
8219
Followers
6
Items
3298
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions