Co-location - 🧠ANSWER ✔✔The term used to describe the situation where the
designers and contractors are placed in close proximity to one another, often in the
same office or jobsite trailer.
Design Reconciliation - 🧠ANSWER ✔✔The process of managing the design to a
set of pre-determined "targets"
ADePT - 🧠ANSWER ✔✔Technology to assess design value.
Request for Proposals - 🧠ANSWER ✔✔Document the describes the procurement
process, forms the basis for final proposals an becomes an element of the contract.
RFP, Technical Proposal, Price Proposal - 🧠ANSWER ✔✔Three documents that
initially govern the DB agreement in the best value competition.
, Controlling Party - 🧠ANSWER ✔✔The party holding the prime contract position
in a multiple firm DB contractual relationship.
35% - 🧠ANSWER ✔✔Design Build RFP's will be evaluated off of less than what
percentage for qualifications based evaluation.
Negotiate - 🧠ANSWER ✔✔What the DB'er now has the right to do after award of
contract.
Honorarium - 🧠ANSWER ✔✔A stated amount sometimes paid to unsuccessful
proposers in consideration of preparing a Design-Build Proposal.
Spearin Doctrine - 🧠ANSWER ✔✔The owner warrants the sufficiency of the plans
and specs to the contractor under this regulation.
Shortlisting - 🧠ANSWER ✔✔The process of narrowing the field of DB teams
through the selection of the most qualified proposers on the basis of qualifications.
Design-Construct Interface - 🧠ANSWER ✔✔When you align design delivery with
the construction schedule.
"No-Go" Example - 🧠ANSWER ✔✔The owner has plans that are too developed