• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

GCOR Glossary questions with accurate answers

Document preview thumbnail
Preview 2 out of 11 pages

GCOR Glossary questions with accurate answers

Content preview

GCOR Glossary questions with accurate answers
Absolute Block Ans✓✓✓ A length od track that no train is permitted to
enter while the track is occupied by another train.


Absolute Signal Ans✓✓✓ A block or interlocking signal without a
number plate or designated by an "A" marker


Articulated Ans✓✓✓ Permanently connected multiple unit cars that
share a common truck.


Automatic Block Signal System (ABS) Ans✓✓✓ A series of continuous
blocks governed by block signals, cab signals, or both. Activated by
train or by certain conditions that affect the block use.


Begin 'OS' Sign Ans✓✓✓ Sign marking the beginning of 'OS' circuit
area for a PAS. Fouling track between this sign and the End 'OS' sing
will cause the PAS to not operate.


Block Ans✓✓✓ A length of track between consecutive block signals or
between a block signal and the end of block system limits.


Block Register Territory (BRT) Ans✓✓✓ A method of operation in
non-signal territory where trains, men, & equipment are authorized to
occupy the main track in limits designated by the timetable.

, Block Signal Ans✓✓✓ A fixed signal at the entrance of a block that
governs trains entering and using that block


Block System Ans✓✓✓ A block or series or consecutive blocks within
ABS, ACS, CTC, or interlocking limits.


Centralized Traffic Control (CTC) Ans✓✓✓ A Block system that uses
block signal indication to authorize train movements.


Clearance Point Ans✓✓✓ The location closest to a switch where it is
safe for equipment, and a person riding the side of equipment unless
prohibited, to pass equipment on adjacent track.


Control Operator Ans✓✓✓ An employee assigned to operate a CTC or
interlocking control machine or authorized to grant track permits.


Control Point Ans✓✓✓ The location of absolute signals controlled by a
control operator or a railroad identifiable point as defined in the
timetable.


Control Point Sign Ans✓✓✓ A sign used to define a control point
within TWC limits.


Controlled Siding Ans✓✓✓ A siding within CTC or interlocking limits
where a signal indication authorizes the sidings use.

Document information

Uploaded on
August 1, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3.8
(402)
Sold
2180
Followers
1346
Items
50083
Last sold
3 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions