Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4,6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 111 pages
Exam (elaborations)

CDT Exam: CDT Exam Questions & Answers: Latest Updated Study Guide: Complete Solution

Document preview thumbnail
Preview 4 out of 111 pages

An addendum cannot be used to change the: A - Contract Sum B - Date and time for receipt of Bids C - Quality of the Work D - Quantity of the Work Reference: and PDPG 13.4.2.8 and 15.11.2.3, and EJCDC C-700 Paragraph 1.01.A.1; AIA A201 Section 1.1.1. Also see CCAPG 8.3. Also see CSPG 9.4. -------------------------------------- (- Answer: A - Contract Sum. Why, you ask? Because Addenda are issued during the bidding (procurement) stage (see Question No. 8), before there is a signed Contract between the Owner and Contractor, and therefore, are issued before there is a Contract Sum. When issued prior to the receipt of Bids (or, with AIA documents, prior to the signature of the Owner-Contractor Agreement), an Addendum can be used to change the date for receipt of Bids, the required quality of the Work, and the scope or extent of the Work. . What would one use to change the Contract Price (Contract Sum in AIA documents)? Hint: It's not an Addendum. For more on how the Contract Price/Contract Sum is modified, see PDPG 15.11.2.3, CCAPG 8.3, CSPG9.4; EJCDC C-700 Paras. 11.02, 11.04, and 11.05; and AIA A201 Sections 7.1 and 7.2. 10. Which of the following is a true statement about addenda? A - They typically arise from a change order B - They are part of the contract documents C - They are listed in Division 01 - General Requirements D - They can be issued at any time during the contract period Reference: PDPG 13.4.2.8; EJCDC C-700 Para 1.01.A.13 and EJCDC C-520 Para. 9.01; AIA A201 Section 1.1.1 and AIA A101 Section 9.1; and "The Diagram". Also see CCAPG 1.3.1. -------------------------------------- (- Answer: B - They are part of the contract documents. This one is a little tricky. During the procurement (bidding) stage, there is no Contract, and because Addenda are issued during the procurement (bidding) stage, how can they be part of the Contract Documents? Well, they BECOME part of the Contract Documents when the OwnerContractor Agreement is signed. While the answer says they "ARE" part of the Contract Documents, they are at a point in time after signing the Owner-Contractor Agreement. All of the other choices to this question are COMPLETELY wrong, so Answer "B" is the best answer out of the choices available.For a list of what constitutes the "Contract Documents", see EJCDC C- 520 (Owner-Contractor Agreement), Paragraph 9.01, and AIA A101 (Owner-Contractor Agreement), Articles 1 and 9, and AIA A201 Paragraph 1.1.1. 11. Select the entity which is essentially assigned the following duties and responsibilities by the Conditions of the Contract - Furnishing surveys and utility locations: A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 12.2.3.1; EJCDC C-700 Paras. 4.03 and 5.05, and AIA A201 Sections 2.3.4 and 2.3.5. Also see especially CCAPG 3.8.9 and 3.8.10. Also see EJCDC E-500 (Owner-Engineer Agreement) Para. B2.01.D (in Exhibit B), and AIA B101 (Owner-Architect Agreement) Section 5.4 (- Answer: B - Owner. Because the Owner furnishes the Site for the Contractor to construct the Work, the Owner is in the best position to have available and furnish surveys and utility locations. It is common,however, for the Owner to make obtaining and furnishing to the Contractor such information part of the A/E's scope of professional services.


Document information

Uploaded on
July 31, 2025
Number of pages
111
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Joy100
4.2
(397)
Sold
2682
Followers
2240
Items
3675
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.