CDT Exam: CDT Exam Study Questions & Answers: Complete Solution
A subcontractor is obligated to the prime contractor in the same manner as the prime contractor is obligated to the: (A) Architect (B) Owner (C) Material Supplier (D) Principal in Charge (- Answer: B Reference: PDPG 2.4.2 , 2.5 Explanation: A subcontractor generally provides labor at the site. A material supplier furnishes the materials for others to install. (PDPG 2.4.2)Subcontractor: An entity that has a direct contract with the contractor to perform a portion of the work of the project at the site. (PDPG 2.5) Supplier: Furnishes or supplies products or services for the project, but does not perform labor at the site. The requirements of the general conditions can bemodified or expanded to accommodate specific project conditions, owner's requirements, or unusual aspects relating to the roles, rights, duties, and responsibilities of the parties to the contract for construction, in this document: (A) Contract Modifications (B) Supplemental Conditions (C) Addendum (D) Consensus Documents (- Answer: B Reference: PDPG 11.5.4.3 Explanation: The requirements of the general conditions can be modified or expanded in the supplementary conditions to accommodate specific project conditions, owner's requirements, or unusual aspects relating to the roles, rights, duties, and responsibilities of the parties to the contract for construction. Supplementary conditions are not standard for every project and must be prepared based on requirements of the specific project. Which of the following are not legal bindingconstruction documents? (A) General Conditions (B) Specifications (C) Preliminary Project Description (D) Addendum (- Answer: C
Document information
- Uploaded on
- July 31, 2025
- Number of pages
- 65
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers