PJM Transmission Exam Study UPDATED ACTUAL Exam Questions and CORRECT Answers During System Restoration, what is the optimal Frequency Range? - CORRECT ANSWER -59.75 - 61 Hz The 500 kV system has normal bus voltages between? - CORRECT ANSWER kV When Connecting 2 islands, the operator must match? - CORRECT ANSWER Phase Angle and Frequency -500 to 550 -Voltage,

Mostrar más Leer menos
Institución
PJM Generation
Grado
PJM Generation











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM Generation
Grado
PJM Generation

Información del documento

Subido en
26 de julio de 2025
Número de páginas
32
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

  • pjm

Vista previa del contenido

PJM Transmission Exam Study UPDATED
ACTUAL Exam Questions and CORRECT
Answers
During System Restoration, what is the optimal Frequency Range? - CORRECT
ANSWER -59.75 - 61 Hz



The 500 kV system has normal bus voltages between? - CORRECT ANSWER -500 to 550
kV


When Connecting 2 islands, the operator must match? - CORRECT ANSWER -Voltage,
Phase Angle and Frequency


What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) -
CORRECT ANSWER -30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of
energized 500 kV


When will PJM issue a Minimum Generation Alert? (how many MW under normal operating
limits) - CORRECT ANSWER -When expected generation levels fall within 2500 MW of
normal operating limits


When a thunderstorm is nearing the BES should auto-reclosing be turned on? - CORRECT
ANSWER -Yes



What does SCADA stand for? - CORRECT ANSWER -Supervisory Control & Data
Acquisition


What does IROL stand for? - CORRECT ANSWER -Interconnection Reliability
Operating Limit

,What does eDART stand for? - CORRECT ANSWER -Dispatcher Application and
Reporting Tool


What is eDART used for? (Electronic Disp Reporting Tool) - CORRECT ANSWER -It is
used for: Generation Outage Scheduling, Instantaneous Reserve Checks, Generator Reactive
Capabilities and to enter and submit switching


What direction do VARS flow? - CORRECT ANSWER -From HIGH Voltage to LOW
Voltage


What direction do MW flow? - CORRECT ANSWER -From HIGH Phase Angle to LOW
Phase Angle


Which of the following factors are NOT used in forecasting load?


1) Weather Forecast
2) Historical Load Forecast
3) Historical Weather Data

4) Locational Marginal Pricing (LMP) Data - CORRECT ANSWER -4


What one-way communication system is used to disseminate info to local call centers? -
CORRECT ANSWER -All-Call


The 3 categories of messages issued by PJM All-Call all EXCEPT:


1) Operational
2) Informational
3) Conflicting Interchange Values

4) Emergency Procedures - CORRECT ANSWER -3

,When should, transmission outages should be submitted to PJM to avoid cancellation and to be
considered "on time?' - CORRECT ANSWER -First day of Month Prior to the Outage


What report will be requested by PJM when a Max Generation Alert is issued? - CORRECT
ANSWER -Supplementary Status Report (SSR)


The loss of a large generation unit on the PJM system can be detected by monitoring: -
CORRECT ANSWER -Frequency and PJM Area Control Error (ACE)


The PJM system is operated such that the contingency flow is less than the: - CORRECT
ANSWER -Emergency Rating



When ordered a 5% voltage reduction should be taken on: - CORRECT ANSWER -The
Distribution System


TOs are required to report "Hot Line Work" on what voltage levels? - CORRECT
ANSWER -345 kV and Above



Load dump rating of an EHV line is determined by? - CORRECT ANSWER -115% of the
facility's 4 hour Emergency Rating


During System Restoration, will closing additional tie lines increase the strength & stability of an
interconnected area? - CORRECT ANSWER -Yes


Which of the following factors influence load forecast (3)?


1) Weather
2) Temperature
3) Reactive Reserves

4) Day of the week - CORRECT ANSWER -1, 2, 4

, During system restoration, what is the voltage range the system should be kept between? -
CORRECT ANSWER -90% and 105% maintain voltage profile between for system
restoration


PJM will coordinate and direct all restoration lines of what voltage levels? - CORRECT
ANSWER -500kV and above


How much load would you dump to increase the frequency by 1 Hz (percentage range)? -
CORRECT ANSWER -6-10%



Generation is disconnected after 5 seconds, when the frequency: - CORRECT ANSWER -
Drops below 57.5Hz


How much of the total Dynamic Reserve should be used on Under Frequency relay load? -
CORRECT ANSWER -


During System Restoration, capacitor banks should be kept off until how much of the load is
restored? - CORRECT ANSWER -40%


Would PJM assume Frequency Control when the control of an interconnected area is too
burdensome for any Local Control Center? - CORRECT ANSWER -Yes


Operator receiving an All-Call message should state the following before playback of the
message? - CORRECT ANSWER -Name and Company



Dynamic Reserves consist of: - CORRECT ANSWER -Governor Reserve and Load that
has been restored with under frequency relays


What would be the appropriate response to receiving a DC ground Alarm? - CORRECT
ANSWER -Advise substation personnel of the alarm during normal hours

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
MGRADES Stanford University
Ver perfil
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1053
Miembro desde
1 año
Número de seguidores
100
Documentos
68976
Última venta
4 horas hace
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

166 reseñas

5
72
4
30
3
42
2
8
1
14

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes