Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 24 pages
Exam (elaborations)

APIC'S CPIM Part 1 Post Test Questions and Answers with solutions

Document preview thumbnail
Preview 3 out of 24 pages

APIC'S CPIM Part 1 Post Test Questions and Answers with solutions

Content preview

APIC'S CPIM Part 1 Post Test Questions and
Answers with solutions



In addition to customer orders, the master production schedule (MPS)
might handle which of the following types of demand?
Bill-of-material items
Interplant orders
Dependent demand
Parts list items - ANSWER Interplant orders: Interplant demand is usually
handled by the master production scheduling system in a manner similar
to customer orders.


A shipment of remote control components is delivered to a factory and
immediately taken to a workstation ready to begin assembly. What is the
name of this inventory management technique?
Lot-for-lot
Lot control
Efficient
Wall-to-wall inventory - ANSWER Wall-to-wall inventory: In wall-to-wall
inventory management, materials enter a plant and are processed right
away, as opposed to being logged in an inventory store until a later date.


Given the following, what is the work center backlog?

,Average input: 100 units/week
Average output: 100 units/week
Current work in process: 160 units
.63 weeks
1 week
1.6 weeks
2.6 weeks - ANSWER 1.6 weeks: To calculate the load that is backlog at a
work center, divide the current number of units (or hours) currently at
the work center by the average output, or 160 units/100 units of output
per week = 1.6 weeks of load.


Which correctly identifies the following examples of costs as internal
failure (I), external failure (E), appraisal costs (A), and prevention costs
(P)?
Operator training= I; product recalls and loss of customers = E; scrap and
machine maintenance= A; in-line inspection = P
Machine maintenance and in-line inspections = I; scrap and loss of
customers = E; product recalls = A; operator training = P
Scrap = I; product recalls and loss of customers = E; in -line inspections =
A; machine maintenance and operator training = P
Product recalls = I; scrap and in-line inspections = E; loss of customers =
- ANSWER Scrap = I; product recalls and loss of customers = E; in -line
inspections = A; machine maintenance and operator training = P: Scrap is
an internal failure cost because it occurs without the customer seeing it.
Product recalls and loss of customers are external failure costs because
the first is directly experienced by customers and the second is a direct
customer reaction to poor quality. In-line inspections are an appraisal
cost because this is an example of a quality control activity. Machine

, maintenance and operator training are examples of prevention costs
because these are investments designed to reduce the chances of
quality problems occurring in the first place.


Companies typically make final purchasing decisions based on which of
the following supplier characteristics?
Supplier fixed cost
Product advertising
Delivery reliability
Free-on-board shipping - ANSWER Delivery reliability: Besides perfect
quality, a key final purchasing decision point is delivery reliability.
Ensuring that purchase deliveries arrive on time is an essential feature
of supplier partnerships.


What type of demand inventory ordering model includes fixed reorder
cycles, fixed reorder quantities, optional replenishment, and hybrid
models?
Material requirements planning
Independent
Drum-buffer-rope
Kanban - ANSWER Independent: independent demand inventory ordering
models include fixed reorder cycles, fixed reorder quantities, optional
replenishment, and hybrid models, among others. Dependent demand
inventory ordering models include material requireme nts planning,
kanban, and drum-buffer-rope.

Document information

Uploaded on
July 25, 2025
Number of pages
24
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Performance
4.3
(238)
Sold
546
Followers
45
Items
19471
Last sold
15 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions