SWPP WALMART TEST
True65or65False?65A65labor65laws65placard65must65be65posted.65-65answer--True
True65or65False?65The65GC65shall65ensure65that65all65subcontractors65and65their65worke
rs65have65secured,65maintained,65and65complied65with65all65required65licenses,65permits
65and65certificates65relating65to,65or65otherwise65necessary65or65appropriate65for,65the65p
erformance65and65completion65of65the65work65and65all65other65activities65and65obligation
s65under65the65Contract65Documents.65-65answer--True
Which65of65the65following65is65required65to65be65present65at65the65job65site?65
A.65Safety65Manual65and65up65to65date65MSDS65binder
B.65SWPP65certificate65posted65
C.65Visitors65sign65in65book
D.65All65of65the65Above65-65answer--All65of65the65above
The65SWPP65implementation65sequence65may65be65modified?65-65answer--
After65consulting65with65the65project65SWPP65Designer65(CEC)65and,65if65required,65the6
5Project65Owner65and65receiving65written65approval.
True65or65False:65the65GC65doesn't65need65to65worry65about65access65control65after65po
ssession.65-65answer--False
When65installing65perimeter65BMP65controls:65-65answer--
Note65locations65and65dates65of65installation65on65the65site65map.
A65SWPP65Site65Map65will65show65all65of65the65following65except:
A.65Locations65of65BMPs65
B.65Notices65of65Violation
C.65Phasing65and65Sequence65
D.65Limits65of65Disturbance65-65answer--B.65Notices65of65Violation65C
In65what65circumstances65must65your65company65run65newly65hired65employees65throug
h65E-Verify?65-65answer--
Any65new65hire65employees65who65will65provide65services65to65Walmart65in65a65mandato
ry65E-Verify65State:65AL,65AZ,65GA,65LA,65MS,65NC,65SC,65TN65or65UT.
, Factors65to65consider65when65creating65your65schedule65include:65-65answer--
Account65for65the65time65it65takes65to65install65or65implement65BMP's65between65each65p
hase65of65construction
Which65of65the65following65is65not65a65silt65fence65related65deficiency?
A.65Tears65or65holes65in65the65fabric
B.65Excessive65sediment65accumulation65
C.65Track65out65
D.65Undercutting65-65answer--C.65Trackout
Requirements65for65managing65stormwater65activity65on65a65construction65site65are65outl
ined65in65the65following65regulation:65-65answer--NPDES
True65or65False:65Subcontractors65do65not65need65a65GC65badge65during65the65first65we
ek65of65construction65as65this65is65the65slowest65time65of65the65project.65-65answer--
False
Runoff65Controls65include65all65but65which65of65the65following:
A.65Rolled65erosion65control65products65
B.65Diversions
C.65Check65dams
D.65Slope65drains65-65answer--A.65Rolled65erosion65control65products
To65reduce65the65possibility65of65undercutting65in65channels,65you65should:65-65answer--
Install65filter65fabric65under65rock65and65similar65materials65placed65within65the65stormwa
ter65conveyance
In65addition65to65Worker65Verification65and65badging,65what65other65incidents65and/or65r
egulatory65contacts65may65happen?65-65answer--Immigration,65E-
Verify,65wages,65harassment,65discrimination65and65joint65employment.
If65a65worker65is65removed65during65an65audit,65are65they65allowed65back65on65site?65-
65answer--Yes,65if65the65auditor65clears65them.
When65inspecting65inlet65protection65look65for65all65but65one65of65the65following:65
A.65Structural65damage65including65torn65fabric65and65broken65supports65
B.65Restricted65flow65and65bypass
C.65Appropriate65vegetative65stabilization65
D.65Accumulated65sediment65and65debris65-65answer--
C.65Appropriate65vegetative65stabilization65D
If65you65believe65stormwater65BMP65modifications65are65necessary,65you65must:65-
65answer--
Seek65written65approval65from65the65project65SWPP65designer65and,65if65required,65the65
project65Owner.
True65or65False?65A65labor65laws65placard65must65be65posted.65-65answer--True
True65or65False?65The65GC65shall65ensure65that65all65subcontractors65and65their65worke
rs65have65secured,65maintained,65and65complied65with65all65required65licenses,65permits
65and65certificates65relating65to,65or65otherwise65necessary65or65appropriate65for,65the65p
erformance65and65completion65of65the65work65and65all65other65activities65and65obligation
s65under65the65Contract65Documents.65-65answer--True
Which65of65the65following65is65required65to65be65present65at65the65job65site?65
A.65Safety65Manual65and65up65to65date65MSDS65binder
B.65SWPP65certificate65posted65
C.65Visitors65sign65in65book
D.65All65of65the65Above65-65answer--All65of65the65above
The65SWPP65implementation65sequence65may65be65modified?65-65answer--
After65consulting65with65the65project65SWPP65Designer65(CEC)65and,65if65required,65the6
5Project65Owner65and65receiving65written65approval.
True65or65False:65the65GC65doesn't65need65to65worry65about65access65control65after65po
ssession.65-65answer--False
When65installing65perimeter65BMP65controls:65-65answer--
Note65locations65and65dates65of65installation65on65the65site65map.
A65SWPP65Site65Map65will65show65all65of65the65following65except:
A.65Locations65of65BMPs65
B.65Notices65of65Violation
C.65Phasing65and65Sequence65
D.65Limits65of65Disturbance65-65answer--B.65Notices65of65Violation65C
In65what65circumstances65must65your65company65run65newly65hired65employees65throug
h65E-Verify?65-65answer--
Any65new65hire65employees65who65will65provide65services65to65Walmart65in65a65mandato
ry65E-Verify65State:65AL,65AZ,65GA,65LA,65MS,65NC,65SC,65TN65or65UT.
, Factors65to65consider65when65creating65your65schedule65include:65-65answer--
Account65for65the65time65it65takes65to65install65or65implement65BMP's65between65each65p
hase65of65construction
Which65of65the65following65is65not65a65silt65fence65related65deficiency?
A.65Tears65or65holes65in65the65fabric
B.65Excessive65sediment65accumulation65
C.65Track65out65
D.65Undercutting65-65answer--C.65Trackout
Requirements65for65managing65stormwater65activity65on65a65construction65site65are65outl
ined65in65the65following65regulation:65-65answer--NPDES
True65or65False:65Subcontractors65do65not65need65a65GC65badge65during65the65first65we
ek65of65construction65as65this65is65the65slowest65time65of65the65project.65-65answer--
False
Runoff65Controls65include65all65but65which65of65the65following:
A.65Rolled65erosion65control65products65
B.65Diversions
C.65Check65dams
D.65Slope65drains65-65answer--A.65Rolled65erosion65control65products
To65reduce65the65possibility65of65undercutting65in65channels,65you65should:65-65answer--
Install65filter65fabric65under65rock65and65similar65materials65placed65within65the65stormwa
ter65conveyance
In65addition65to65Worker65Verification65and65badging,65what65other65incidents65and/or65r
egulatory65contacts65may65happen?65-65answer--Immigration,65E-
Verify,65wages,65harassment,65discrimination65and65joint65employment.
If65a65worker65is65removed65during65an65audit,65are65they65allowed65back65on65site?65-
65answer--Yes,65if65the65auditor65clears65them.
When65inspecting65inlet65protection65look65for65all65but65one65of65the65following:65
A.65Structural65damage65including65torn65fabric65and65broken65supports65
B.65Restricted65flow65and65bypass
C.65Appropriate65vegetative65stabilization65
D.65Accumulated65sediment65and65debris65-65answer--
C.65Appropriate65vegetative65stabilization65D
If65you65believe65stormwater65BMP65modifications65are65necessary,65you65must:65-
65answer--
Seek65written65approval65from65the65project65SWPP65designer65and,65if65required,65the65
project65Owner.