Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 47 pages
Exam (elaborations)

LADWP FINAL EXAM STUDY GUIDE TEST.

Document preview thumbnail
Preview 4 out of 47 pages

LADWP FINAL EXAM STUDY GUIDE TEST. 1. Pole steps 135 deg apart No less than 9' to first step 36" space between steps on same side 2. Vertical clearance between the lowest energized part of equipment 4' from cross arms and ex- tended racks cut-outs or line disconnects and 0-750 volt conductors 6' from 3 spool rack attached to: Reference Rules 58.1C, and 58.3A 3. Pole risers • Priority 1 - Keep ris- er(s) outside of the climb- ing space. • Priority 2 - Place on op- posite side of pole from oncoming traflc, if not possible to maintain climbing space place the risers facing traflc. • Priority 3 - Best remain- ing location to accommo- date direction of conduit, if riser(s) are to be placed on the street side of the pole, the distance between the face of the riser and the curb face should preferably be 18" if possible, but no less than 12". 4. High volt signs approximately 30" below the lowest line conductor energized in excess of 750 volts 6" below the equipment and above all secondary conductors and com approximately 30 inches below the lowest exposed energized portion of the pothead. 5. Guy make ups YBOG Yellow- 1/4" 2375 Black- 5/16" Orange 3/8" 5400 Green 7/16" 7250 6. Service make ups #4 orange ORYOG #2 red 1/0 yellow 3/0 orange 336 green 7. Bullet colors 8 sol brown 6 sol green 8. 34.5 mid span lateral Min 35' from pole Reduced tension span not to exceed 55' Line conductor sizes for mid-span clamp 3/0 ASCR to 795 AAC and 1/0 to 350 CU Max dead end strain on clamp not to exceed 1000 lbs. max wire size of 477 ASCR & 4/0 CU at reduced ten- sion 9. Single cross arm Carriage bolt w nuts Mechanical gain 18" da bolt. X2 nuts/wash- ers V brace 60"

Content preview

LADWP FINAL EXAM STUDY GUIDE TEST.

1. Pole steps 135 deg apart
No less than 9' to first
step
36" space between
steps on same side

2. Vertical clearance between the lowest 4' from cross arms and
energized part of equipment ex- tended racks
cut-outs or line disconnects and 0-750 volt conductors 6' from 3
spool rack
attached Reference Rules
to: 58.1C, and 58.3A

3. Pole risers • Priority 1 - Keep ris-
er(s) outside of the
climb- ing space.
•Priority 2 - Place on
op- posite side of
pole
from oncoming traflc,
if not possible to
maintain climbing
space place the risers
facing traflc.
•Priority 3 - Best
remain- ing location to
accommo- date
direction of conduit, if
riser(s) are to be
placed on the street
side of the pole, the
distance between the
1/
47

,LADWP FINAL EXAM STUDY GUIDE TEST.

face of the riser and
the curb face should
preferably be 18" if
possible, but no less
than 12".




2/
47

, LADWP FINAL EXAM STUDY GUIDE TEST.


4. High volt signs approximately 30" below
the lowest line conductor
energized in excess of 75
volts

6" below the equipment
and above all
secondary
conductors and
com

approximately 30 inches
below the lowest
exposed energized
portion of the
pothead.

5. Guy make ups YBOG
Yellow- 1/4" 2375
Black- 5/16"
Orange 3/8"
5400
Green 7/16" 7250

6. Service make ups #4 orange ORYOG
#2 red 1/0
yellow
3/0 orange 336
green

7. Bullet colors 8 sol brown
6 sol green

3/
47

, LADWP FINAL EXAM STUDY GUIDE TEST.

8. 34.5 mid span lateral Min 35' from pole

Reduced tension span

not




4/
47

Document information

Uploaded on
July 25, 2025
Number of pages
47
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Nursewendo
3.7
(22)
Sold
71
Followers
19
Items
4976
Last sold
2 months ago


Reviews from verified buyers

3 months ago

Answers are all over the place




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions