100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C215 Study Guide – FINAL EXAM (Latest 2025/ 2026 Update) Questions and Verified Answers| 100% Correct| Grade A

Rating
-
Sold
-
Pages
33
Grade
A+
Uploaded on
24-07-2025
Written in
2024/2025

WGU C215 Study Guide – FINAL EXAM (Latest 2025/ 2026 Update) Questions and Verified Answers| 100% Correct| Grade A












Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
July 24, 2025
Number of pages
33
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • wgu c215

Content preview

WGU C215 Study Guide – FINAL EXAM
(Latest 2025/ 2026 Update) Questions
and Verified Answers| 100% Correct|
Grade A

Total Quality Management (TQM) Philosophy - ANSWER 1.
customer focus
2. continuous improvement
3. employee empowerment
4. use of quality tools
5. product design
6. process management
7. managing supplier quality



Process Capability Index (Cpk) - ANSWER Basic function of Six
Sigma. Measures the process potential and performance of processes. The higher
the range of Cpk, the improved is the ability of the process to complete its
necessities.



Six Sigma - ANSWER A disciplined, data-driven approach and
methodology for eliminating defects (driving toward six standard deviations
between the mean and the nearest specification limit) in any process - from
manufacturing to transactional and from product to service.



Design Capacity - ANSWER The theoretical maximum output of a
system in a given period under ideal conditions.

,Location Analysis - ANSWER proximity to customers,
transportation, source of labor, community attitude, proximity to suppliers, and
many other factors.

The technique for determining location decisions.



Line Processes - ANSWER A type of process used to produce a large
volume of a standardized product.

■ Limited customization and high volume



Batch Processes - ANSWER A type of process used to produce a
small number of products in groups or batches based on customer orders or
specifications.

■ High customization moderate volume



Project Processes - ANSWER A type of process used to make a one-
at-a-time product exactly to customer specifications.

■ Most custom and lowest volume



Continuous Processes - ANSWER A type of process that operates
continually to produce a high volume of a fully standardized product.

- No customization and as high a volume as possible



Bottleneck - ANSWER Longest task in the process.

,Flexible Manufacturing System (FMS) - ANSWER A type of
automated system that combines the flexibility of intermittent operations with the
efficiency of continuous operations.



Output/Input Control - ANSWER A technique for monitoring the
flow of jobs between work centers.



Value-Added - ANSWER The net increase created during the
transformation of inputs into final outputs.



Hybrid Layouts - ANSWER Layouts that combine characteristics of
process and product layouts.

- Group technology layouts.
- Cell technology layouts.
- Grocery stores use hybrid layouts



Relationship Chart (REL) - ANSWER Table that reflects opinions of
managers with regard to the importance of having any two departments close
together.



Rectilinear Distance - ANSWER The shortest distance between two
locations using north-south and east-west movements.



From-To Matrix - ANSWER Table that gives the number of trips or
units of product moved between any pair of departments.

, Block Plan - ANSWER Schematic showing the placement of
resources in a facility.



Mean Observed Times - ANSWER The average of the observation
times for each of the work elements.



Normal Time - ANSWER The mean observed time multiplied by the
performance rating factor by the frequency of occurrence.



Standard Time - ANSWER The length of time it should take a
qualified worker using appropriate process and tools to complete a specific job,
allowing time for personal fatigue and unavoidable delays.



Just-in-Time (JIT) - ANSWER A philosophy designed to achieve
high-volume production through elimination of waste and continuous
improvement. Based on a "pull" system rather than a "push" system. The three
elements are just-in-time manufacturing, total quality management, and respect for
people.



Kanban card - ANSWER A card that specifies the exact quantity of
product that needs to be produced.



Tier One Suppliers - ANSWER Supplies materials or services
directly to the processing facility.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PERFECTGRADES Rasmussen College
View profile
Follow You need to be logged in order to follow users or courses
Sold
627
Member since
4 year
Number of followers
490
Documents
1542
Last sold
1 week ago

4.4

82 reviews

5
57
4
8
3
12
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions