Although the BSP/ESP Part 1 is normally unclassified, how is it marked? - Correct
Answer-✔✔FOUO
Code that indicates what type of commodities, if any, is pre-positioned. - Correct
Answer-✔✔PREP
Define derivative classification. - Correct Answer-✔✔Incorporating, paraphrasing,
restating, or generating in new form information that is already classified and
marking the newly developed material consistent with the markings that apply to
the source information.
define GFM. - Correct Answer-✔✔GFM is a process to align force apportionment,
assignment, and allocation methodologies in support of defense strategy and in
support of joint force availability requirements.
Define JPP. - Correct Answer-✔✔An orderly, analytical set of logical steps to frame
a problem; examine a mission;develop, analyze, and compare alternative COAs;
select the best COA; and produce a plan or order.
Define NAF - Correct Answer-✔✔Tactical echelon directly under an operational
MAJCOM that provide operational leadership and supervision
Define the term "marking". - Correct Answer-✔✔Safeguarding classified
information for which they have access
,Describe the 635 SCOWs WRM responsbilities? - Correct Answer-✔✔The 635
SCOW oversees and directs all aspects of WRM program management and
employment of capability, through its subordinate organization. They prioritize
WRM funding, fills and requirements with an enterprise focus. Additionally they
consolidate unit readiness reporting and collaborate on WRM strategic planning
efforts to include war plans.
Describe the intent of ACSAs. - Correct Answer-✔✔To provide commanders with a
flexible tool to obtain or provide logistics support, supplies amd services when
mission needs prevent self-support.
Evaluates consumable quantities to ensure there is adequate storage. - Correct
Answer-✔✔Material management WRM
Evaluates MRE requirements for self sustaining units as well as missile crews if
applicable? - Correct Answer-✔✔Services WRMM
Evaluates munitions quantities to ensure there are adequate storage capabilities
and maintains adequate munitions stocks. - Correct Answer-✔✔munitions WRMM
Evaluates the daily fuel consumption rates and total fuels requirements from the
WCDO to determine if the IMP adaquately supports the WAAR. - Correct Answer-
✔✔Fuels WRMM
Explain data aggregation. - Correct Answer-✔✔Data aggregation is a type of data
information mining process where data is searched, gathered, and presented in a
,report-based, summarized format to achieve specific objectives or processes
and/or conduct human analysis.
For how long can the installation WRMPM release WPARR support equipment or
WRM vehicles for indirect mission support? - Correct Answer-✔✔For up to 30
days.
For what documents is the WAAR a source document? - Correct Answer-✔✔the
WCDO, WPARR, IMP
For what kind of locations are BSPs developed? - Correct Answer-✔✔Locations
with a permanent military presence. and are fully developed by the collaborative
planning efforts of many functional experts with a deliberate planning time line?
For what programs are base level logistics planers the OPR? - Correct Answer-
✔✔APEX, deployment planning and execution, BAS&E/base support planning,
WRM, Intra-service/intra-/inter-agency support agreements, ACSA, LOGMOD &
BAS&E
How are functional area experts and WRMMs able to use the WAAR, sortie rates,
and duration information? - Correct Answer-✔✔to figure how many consumables
and equipment items will be required to support the proposed sorties.
How are reimbursements accomplished? - Correct Answer-✔✔With a funds
transfer instrument
, How are swing stocks positioned? - Correct Answer-✔✔Ashore or afloat.
How are WRM packaged? - Correct Answer-✔✔By capability packages
How do ACSA provisions enchance operational readiness? - Correct Answer-✔✔By
facilitating simplified procurement of resources by allowing US forces to acquire
items outside of commercial contracting procedures and transfer items outside of
foreign military sales.
How does the logistics planner verify correct quantities are on hand? - Correct
Answer-✔✔Reconcile WRM authorization document with WRM source
documents
How is the AF COLS utilized? - Correct Answer-✔✔AF COLS is now common
language utilized to communicate the best value of installing support delivery,
establish consistent support expectations, as well as explain the impacts of
resource limitations.
How is the swing stock identified in the units UTA? - Correct Answer-✔✔Swing
stocks will be identified on the storing units UTA using posturing code "WR"
How long of a time frame is allowed when an individual is upgrading form a 3-skill
level to a 5-skill level? - Correct Answer-✔✔no longer than 12 months
How many modules does BAS&E use? - Correct Answer-✔✔Four modules on
NIPRNET and five modules on SIPRNET.