Class 1 Product
Ans: General Electronics Product - includes products where the
major requirement is function of the completed assembly.
Class 2 Product
Ans: Dedicated Service Electronic Product - Continued
performance and extended life required. Uninterrupte d service
is desired but not required.
Class 3 Product
Ans: High Performance Electrical Product - Continued high
performance or performance-on-demand is critical. Equipment
downtime cannot be tolerated. Equipment might be used for
life-support or other critical systems.
Who as the ultimate responsibility for identifying the class to which the
assembly is evaluated?
Ans: The Customer.
All rights reserved © 2025/ 2026 |
, Page |2
Shall
Ans: Invokes a requirement for manufacturers of all classes or
product, and failure to comply with the requirement is a
noncompliance to this standard.
Order of Precedence in event of conflict 1
Ans: 1. Procurement as agreed and documented between
customer and supplier.
Order of Precedence in event of conflict 2
Ans: Master drawing or master ass. drawing reflecting the
customer's detailed requirements.
Order of Precedence in event of conflict 3
Ans: IPC-1-610 when invoked by the customer or contract.
If documents other than IPC-A-610 are cited, the order of precedence
shall be defined in the _
Ans: Procurement documents
Target Condition
All rights reserved © 2025/ 2026 |
IPC A 610 Questions and Correct Answers/
Latest Update / Already Graded
Class 1 Product
Ans: General Electronics Product - includes products where the
major requirement is function of the completed assembly.
Class 2 Product
Ans: Dedicated Service Electronic Product - Continued
performance and extended life required. Uninterrupte d service
is desired but not required.
Class 3 Product
Ans: High Performance Electrical Product - Continued high
performance or performance-on-demand is critical. Equipment
downtime cannot be tolerated. Equipment might be used for
life-support or other critical systems.
Who as the ultimate responsibility for identifying the class to which the
assembly is evaluated?
Ans: The Customer.
All rights reserved © 2025/ 2026 |
, Page |2
Shall
Ans: Invokes a requirement for manufacturers of all classes or
product, and failure to comply with the requirement is a
noncompliance to this standard.
Order of Precedence in event of conflict 1
Ans: 1. Procurement as agreed and documented between
customer and supplier.
Order of Precedence in event of conflict 2
Ans: Master drawing or master ass. drawing reflecting the
customer's detailed requirements.
Order of Precedence in event of conflict 3
Ans: IPC-1-610 when invoked by the customer or contract.
If documents other than IPC-A-610 are cited, the order of precedence
shall be defined in the _
Ans: Procurement documents
Target Condition
All rights reserved © 2025/ 2026 |