Under Dispenser Containment is required to be designed and constructed in
accordance with ____.
a. the appropriate Executive Order
b. generally accepted secondary containment practices
c. standards of an independent testing organization with industry code
d. an engineering specification approved by a state registered professional engineer
or engineering standard - Answer✅✅c. standards of an independent testing
organization with industry code
With a Gilbarco Vapor-Vac, the OPW 12VW nozzle has a hole or tear in the vapor
escape guard, it is a defect if ____% of the circumference is missing.
a. 25%
, b. 75%
c. 50%
d. 65% - Answer✅✅b. 75%
Gasoline thread sealant can be used on all except _____.
a. threaded portion of rotatable adapters
b. p/v valve
c. ball float
d. riser adapter - Answer✅✅a. threaded portion of rotatable adapters
when installing copper tubing use all except _____.
a. copper tubing cutter
b. copper bending tool
c. copper flaring tool
d. copper stretching tool - Answer✅✅d. copper stretching tool
The Husky P/V valve has a torque range of...
a. 50-75 lbs
b. 20-50 lbs
c. 30-50 lbs
d. 40-50 lbs - Answer✅✅b. 20-50 lbs
When installing the hanging hardware together use...
a. pipe dope
b. non-hardening sealant
c. teflon tape
d. oil or grease - Answer✅✅d. oil or grease
When installing in the EO VR-101-E you should have on site _____.
a. the executive order
b. Phil-tite installation manual
c. the equipment checklist
d. all the above - Answer✅✅d. all the above
There are four ball valves on the clean air separator, what position are they to be in?
a. top and bottom valve open, the rest are closed
b. top and bottom valve closed, the rest are open
c. top valve open, the rest are closed
d. bottom valve open, the rest are closed - Answer✅✅c. top valve open, the rest