100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

3rd Class Stationary Steam Engineer License Prep Exam 2025| Certified Q&A

Rating
-
Sold
-
Pages
41
Grade
A+
Uploaded on
22-07-2025
Written in
2024/2025

3rd Class Stationary Steam Engineer License Prep Exam 2025| Certified Q&A

Institution
3rd Class Stationary Steam Engineer License
Course
3rd Class Stationary Steam Engineer License











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
3rd Class Stationary Steam Engineer License
Course
3rd Class Stationary Steam Engineer License

Document information

Uploaded on
July 22, 2025
Number of pages
41
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • 3rd class s

Content preview

1|Page




3rd Class Stationary Steam Engineer
License Prep Exam 2025| Certified Q&A


combustion requires____ - correct-answer-fuel, oxygen, and Heat




the three most common fuels used in boilers are _____ - correct-answer-gas, fuel
oil, and Coal




incomplete combustion can be caused by ______ - correct-answer-insufficient air




after replacing a gauge glass but before placing it in service, it is necessary to
______ - correct-answer-crack open the steam valve in warm the gauge glass




two bottom blowdown valves are required on boilers operating at pressures
above______ psi - correct-answer-100

,2|Page


extra heavy steel pipe is required on a boiler bottom blowdown line when the
pressure is above ____ psi - correct-answer-125




package boilers are programmed to _____ - correct-answer-ignite the burner in
low fire




there are________ sq ft of heating surface in a water tube 3 1/2" in diameter and
20' long - correct-answer-18.32




to change 1 lb of water from and at212 °f into steam at atmospheric
pressure,______ btu are necessary - correct-answer-970.3




a surface condenser is one that______ - correct-answer-has circulating water
flowing through the tubes and exhaust steam around the outside of the tubes




a boiler is rated at 30,000 lb/hr and has a 5% blow down loss. The minimum size
feed water pump to supply this boiler is ________ gal./hr. - correct-answer-3795

,3|Page


three types of draft used in power plants are______ - correct-answer-natural,
forest, and induced




in a water tube boiler, heat and gases of combustion pass______ - correct-
answer-around the tubes




when the burner is in high fire, the______ - correct-answer-air-fuel ratio is at
maximum rate




a boiler with a draft gauge showing a positive pressure indicates_____ - correct-
answer-furnace pressure is above atmospheric pressure




downcomer tubes are found _____ - correct-answer-in a water tube boiler




a boiler connected in battery requires a free blowing drain between the two stop
valves when the ______ - correct-answer-boiler has a manhole opening




most furnace explosions are caused by _____ - correct-answer-failure to purge
the furnace at startup

, 4|Page




baffles in the boiler are designed to direct gases of combustion for close contact
with the ________ - correct-answer-boiler heating surface




the overspeed tripping device on a steam turbine must be tripped when____ -
correct-answer-shutting down the steam turbine




one gallon of no. 6 fuel oil weighs approximately _______ lb. - correct-answer-8.2




three types of boiler feed water pumps are _____ - correct-answer-reciprocating,
centrifugal, and turbine




the most important fitting on a boiler is the______ - correct-answer-safety valve




viscosity of fuel oil is a________ - correct-answer-measure of internal resistance
to flow

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PRECEPTERTABY Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
65
Member since
9 months
Number of followers
0
Documents
6007
Last sold
11 hours ago
PROFESSIONAL ACADEMIC TUTOR

Welcome To my Store!! Certified tutor, offering accurate, reliable, and current study materials to support students in their exam preparation and assignments. Aiming to provide the best resources, such as summaries, nursing exam test. Up-to-date exams and assignments, Detailed test banks with verified questions and answers, Elaborate exam solutions, Case studies and discussions I’m committed to providing only high-quality documents to ensure the best outcomes. Get instant access to expertly prepared materials designed to help you excel in your academic journey. Reach out today and take a step closer to achieving your goals! Always be Encouraged to leave a review after a purchase, all complements and comments, positive & Negative are appreciated to guide for better changes.

Read more Read less
4.3

8 reviews

5
6
4
0
3
1
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions