CM 413 Jobsite Final Exam UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS True - CORRECT ANSWER Building codes and standards are largely silent on temporary structures and the technical literature is scant on the subject. All of the above - CORRECT ANSWER Temporary support and access structures have a critical effect on the ______ of construction projects. True - CORRECT ANSWER A contractor for simple temporary structures has to submit detailed plans, prepared or checked and signed by a licensed professional engineer.

Content preview

CM 413 Jobsite Final Exam UPDATED
ACTUAL QUESTIONS AND CORRECT
ANSWERS
True - CORRECT ANSWER Building codes and standards are largely silent on
temporary structures and the technical literature is scant on the subject.



All of the above - CORRECT ANSWER Temporary support and access structures have
a critical effect on the ______ of construction projects.



True - CORRECT ANSWER A contractor for simple temporary structures has to
submit detailed plans, prepared or checked and signed by a licensed professional engineer.



when they are necessary parts of the construction of the final project - CORRECT
ANSWER When is the owner concerned with temporary structures?



are different from - CORRECT ANSWER Aspects of temporary structures, such as
design, allowable stresses and loads, materials, and inspection, _______ the permanent
structure.



amount of safety staff on site - CORRECT ANSWER Which of the following is not a
factor in the design of temporary structures?



Years of experience of the site superintendent - CORRECT ANSWER Which of the
following is NOT a factor inherently involved in the design loads, allowable stresses, and
safety factors used for the design of various structures:



True - CORRECT ANSWER Temporary structures are often constructed of reusable
prefabricated elements.

, General Liability insurance - CORRECT ANSWER What type of insurance covers the
owner and the contractor for the risks assumed in temporary construction?



All of the above - CORRECT ANSWER Who is responsible for the inspection of
temporary structures



True - CORRECT ANSWER A "grandfather" clause is when owners and engineers
attempt to pass on the unexpected costs to the contractor.



All of the above - CORRECT ANSWER When is insurance applied or required



Depends on the Contract - CORRECT ANSWER Who is responsible for unexpected
underground conditions?



Develop a budget and create separate accounts for each project. - CORRECT
ANSWER What is a good banking strategy for tracking money for each project?



The Temporary Structure Contractor - CORRECT ANSWER Who is responsible for
drawing up the specifications for the temporary structure?



True - CORRECT ANSWER Estimates for the cost of temporary structures entail a
three step process?



All of the above - CORRECT ANSWER A contractor's cost-keeping system should
provide the contractor with information for which of the following?



True - CORRECT ANSWER A cost of labor and materials plus markup is the type of
change order that occurs when there is no agreement between the parties as to how to best
resolve the value of a completed change.



All of the above - CORRECT ANSWER What goes into the cost estimate of temporary
structures?

Document information

Uploaded on
July 20, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
70
Followers
2
Items
10505
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions