Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

NETTCP Concrete Inspector || Get it Correct.

Document preview thumbnail
Preview 3 out of 19 pages

False correct answers Quality assurance is defined as only those planned and systematic actions taken by the agency to provide confidence that a product or facility will perform satisfactorily in service. (1-1) True correct answers A quality assurance program serves as a skeleton or overall framework necessary for construction quality assurance implementation. (1-4) True correct answers Joint development and review of quality assurance specifications should include agency and industry personnel (engineers, inspectors, technicians) who are directly responsible for construction. (1-5) True correct answers The same six core elements required for design-bid-build construction QA programs are also required for design-build construction QA programs. (1-8) False correct answers Quality control activities include only sampling and testing. Visual inspection is relegated to the acceptance inspector. (1-10) True correct answers Quality control plans are project specific documents whose function is to address specific production facility and field placement processes for individual categories of work on a construction project. (1-11) True correct answers Acceptance is the responsibility of the transportation agency. (1-12) True correct answers The engineering limits are the absolute threshold values for individual test results (1-15) True correct answers Quality assurance specifications typically use quality measures. (1-14)

Content preview

NETTCP Concrete Inspector || Get it Correct.


False correct answers Quality assurance is defined as only those planned and systematic actions
taken by the agency to provide confidence that a product or facility will perform satisfactorily in
service. (1-1)


True correct answers A quality assurance program serves as a skeleton or overall framework
necessary for construction quality assurance implementation. (1-4)


True correct answers Joint development and review of quality assurance specifications should
include agency and industry personnel (engineers, inspectors, technicians) who are directly
responsible for construction. (1-5)


True correct answers The same six core elements required for design-bid-build construction QA
programs are also required for design-build construction QA programs. (1-8)


False correct answers Quality control activities include only sampling and testing. Visual
inspection is relegated to the acceptance inspector. (1-10)


True correct answers Quality control plans are project specific documents whose function is to
address specific production facility and field placement processes for individual categories of
work on a construction project. (1-11)


True correct answers Acceptance is the responsibility of the transportation agency. (1-12)


True correct answers The engineering limits are the absolute threshold values for individual test
results (1-15)


True correct answers Quality assurance specifications typically use quality measures. (1-14)

,True correct answers Since the objective of the IA comparison is to identify discrepancies or
variability in testing procedures or equipment, IA testing is performed on split samples. (1-20)


True correct answers If Contractor QC test results are not utilized in the acceptance decision, a
dispute resolution system is not required. (1-21)


True correct answers All Agency Central Laboratories are required under federal regulations to
be accredited through AASHTO Accreditation Program (AAP). (1-23)


True correct answers Personal Qualification/Certification programs should include requirements
for re-certification at 2 to 5 year intervals. (1-26)


True correct answers Each Agency Construction QA Program must meet the requirements of 23
CFR 637B and is required to be approved by FHWA. (1-27)


True correct answers The process of hydration begins immediately when the cement comes in
contact with water. (2-1)


True correct answers The cement paste density and strength are related. (2-1)


True correct answers AASHTO M 85 (ASTM C 150) stipulate cement types based on chemical
composition. (2-3)


False correct answers Type III cement is known as a low heat of hydration cement. (2-3)


True correct answers According to ACI 318, mixtures using Type I cement should be cured for 7
days. (2-4)


True correct answers Lowering the heat of hydration in massive concrete structures is important
to prevent thermal cracking. (2-4)

, True correct answers A type IP(10) is used to indicate a Portland-pozzolan blended product, with
10% pozzolan. (2-5)


True correct answers Expansive cement is a special product designed to offset stresses in
concrete caused by drying shrinkage, which when excessive can lead to cracking. (2-6)


True correct answers The time of set for cement paste is determined via a needle penetration
method. (2-7)


False correct answers Cement should be stored in humid or moist environments to ensure
hydration has started prior to being introduced into the concrete mixer. (2-8)


True correct answers A pozzolan is a material which in itself possesses little or no cementitious
activity, but when combined with hydraulic cement, will behave in a cementitious manner. (3-1)


True correct answers Fly ash tends to increase the consistency of concrete when compared to
mixtures with just Portland Cement. (3-3)


False correct answers Dosages of air entrainment generally need to be lowered when fly ash is
used. (3-3)


True correct answers When compared to mixtures using just Portland cement, mixtures
supplemented with Grade 120 slag cement have greater 28 day strength. (3-5)


True correct answers Fly ash and slag retard the set time of concrete. (3-8)


True correct answers Fly ash and silica fume reduce bleeding in concrete. (3-8)


False correct answers Workability is increased with silica fume. (3-6)

Document information

Uploaded on
July 18, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.79

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
798
Followers
438
Items
40095
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions