• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

CQM-C Certification || All Solved.

Document preview thumbnail
Preview 2 out of 5 pages

The ______ consists of daily checks of the work to assure continuing compliance with contract requirements correct answers Follow-up phase Design-Build contracts require: correct answers *The QC Manager to be in place and take an active role in the review and coordination of the design* Which of the following is included in all three phases of the Three Phases of Control correct answers Safety The purpose of Construction Quality Management is to correct answers *Achieve the quality established by properly developed requirements through the combined responsibility, but separate, efforts of contractor and Government personnel* Testing is extremely important in Construction Quality Management and is performed by correct answers Both the contractor and the Government The primary purpose of the Three-Phase Control System is to: correct answers Require the contractor to plan, schedule, and perform quality management actions to assure work meets all specified quality standards Quality Assurance Personnel have the responsibility to: correct answers *require the contractor to maintain the quality specified in the plans and specifications* the ____ is the appropriate time to assure that all materials and/or equipment have been tested. submitted, and approved. correct answers Preparatory Phase The Preconstruction Conference and the Coordination and Mutual Understanding Meeting are: correct answers conducted prior to the commencement of any physical construction work

Content preview

CQM-C Certification || All Solved.


The ______ consists of daily checks of the work to assure continuing compliance with contract
requirements correct answers Follow-up phase


Design-Build contracts require: correct answers *The QC Manager to be in place and take an
active role in the review and coordination of the design*


Which of the following is included in all three phases of the Three Phases of Control correct
answers Safety


The purpose of Construction Quality Management is to correct answers *Achieve the quality
established by properly developed requirements through the combined responsibility, but
separate, efforts of contractor and Government personnel*


Testing is extremely important in Construction Quality Management and is performed by correct
answers Both the contractor and the Government


The primary purpose of the Three-Phase Control System is to: correct answers Require the
contractor to plan, schedule, and perform quality management actions to assure work meets all
specified quality standards


Quality Assurance Personnel have the responsibility to: correct answers *require the contractor
to maintain the quality specified in the plans and specifications*


the ____ is the appropriate time to assure that all materials and/or equipment have been tested.
submitted, and approved. correct answers Preparatory Phase


The Preconstruction Conference and the Coordination and Mutual Understanding Meeting are:
correct answers conducted prior to the commencement of any physical construction work

, Contractor testing procedures: correct answers are specified in the technical specifications,
outlined in the Quality Control Plan, and addressed at the Coordination and Mutual
Understanding Meeting.


The Quality Control Plan contains: correct answers Identification of individual quality control
personnel, including name, qualifications, assigned duties, responsibilities and authorities


Tests that are unnanounced, randomly performed, and repeat quality control tests are: correct
answers quality assurance tests


The contractor is required to conduct a preparatory phase meeting before they begins any
definable feature of work except when: correct answers there are no exceptions to the rule


During the punch-out inspection of a project: correct answers *Quality control personnel prepare
a punch-list and make corrections*


The Quality Control Report should include: correct answers All of the above :
Work in Progress
Work that has been completed
Problem areas


In a design-build contract, if the contractor has a question about the design, what is the process to
get an answer? correct answers *Contractor submits a design verification request to the
contractor's design team.*


Submittals are: correct answers Necessary to demonstrate that the proposed materials, etc. are in
compliance with the contract.


The success or failure of all contractors is based upon: correct answers The ability to control
costs, finance work, estimate jobs, schedule the work and maintain effective quality control

Document information

Uploaded on
July 18, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
807
Followers
438
Items
40068
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions