• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

Electrical Craft Helper Exam Questions And 100% Verified Answers!!

Document preview thumbnail
Preview 2 out of 6 pages

ELECTRICAL CRAFT HELPER EXAM QUESTIONS AND 100% VERIFIED ANSWERS!!

Content preview

EROSION CONTROL CERTIFICATION AND
SEDIMENTATION EXAM QUESTIONS AND
100% VERIFIED ANSWERS!!
A CGP is required for projects that disturb _____ or more acres of land

1

The CGP permit requires inspections how often?

weekly and within 24 hours of the end of a storm 1/2 inch or greater

A storm water event with a ______ hour break in between is still considered one storm
water event

4

The CGP permit requires sediment basins for areas _____ or more

10 acres

Any BPM that collects sediment must be cleaned before it reaches _____ of it's capacity

50%

Never service construction equipment near a live stream, use storm water sewers instead
T/F

False

A temporary gravel construction entrance must extend the full width of the entrance. It
must be at least _____ ft long and _____ in thick. Aggregate should be _____ in stone or
FDOT No. _____ stone

50, 6, 2, 1

Prior to installing gravel entrance ______ should be placed on the ground and maintenance
should be performed when the voids are full of ______

geotextile, sediment

, Max drainage are for a silt fence under _____ flow conditions is ____ acre per 100 ft of
barrier length

sheet, 1/4

The average usable life of a silt fence is ____ months

6

For proper installation of silt fence a trench ____ by _____ must be excavated. This will
allow_______ of fabric to extend into the ground for back-filling and compaction

4, 4, 8

Max drainage area for an inlet protection is ______

1 acre

Purpose of a sediment trap is to _____ turbid water

detain

Max drainage area for a temporary sediment trap is _____

5 acres

Initial storage capacity for a sediment trap is _______ yards per acre or _______ ft^3/acre

134 cubic, 3600

Sediment basin is required for drainage areas more than ______

5 acres

In a sediment trap or basin baffles are used to ______

increase flow length

A diversion earthen dike shall be used to ________ into a temporary slope drain

direct stormwater

Document information

Uploaded on
July 17, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
KenAli
2.6
(18)
Sold
120
Followers
5
Items
25559
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions