UNIT 9 IT PROJECT MANAGEMENT - ASSIGNMENT 2 (ALL CRITERIA MET)
Vocational Scenario or Context You have been asked to project manage the development of a software solution (the software solution will be developed for Unit 6 – Web Development) You need to: • Research and evaluate two possible solutions to the IT problem, identifying and evaluating the project risks and constraints and suggest viable methods of controlling the risks. • Prepare a feasibility study (including an introduction to the project, overall description, a requirements specification and success criteria) and select a preferred solution.) • Project manage the development of the software solution, including the planning, execution, monitoring and control of the project. You need to perform the project management processes in a consistent and effective manner using an appropriate methodology. You should include evidence of: o Project phasing, dividing up the user requirements. Task 1 3 o Use of typical project management processes such as the development of risks, issues and tasks, prioritising of work, management of barriers or constraints, regular meetings, budget and resource control) Checklist of evidence required • Evaluation of two possible solutions • Evidence of research into two different solutions • Feasibility study • Evidence of project management planning, monitoring and control of the development activities Criteria covered by this task: Unit/Criteria reference To achieve the criteria you must show that you are able to: BC.D2 Evaluate consistently and comprehensively at least two researched and realistic solutions to an IT problem on a given theme and justify using logical chains of reasoning a preferred solution. BC.D3 Perform consist
Document information
- Study Level
- BTEC
- Subject
- Information Technology 2016/2017 NQF
- Uploaded on
- July 16, 2025
- Number of pages
- 63
- Written in
- 2024/2025
- Type
- Essay
- Professor(s)
- Unknown
- Grade
- A+