Asphalt Paving Level 1 EXAM COMPREHENSIVE questions answered
Asphalt Paving Level 1
2025 verified graded A+ already passed!
Study online at https://quizlet.com/_a09si7
1. A full lot of super pave asphalt is what size? 2000 to 4000 tons
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production
2. Which is not typically used as an asphalt binder in fdot PG 62-22
mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA)
3. Who cuts the density cores used for verification test- The contractor
ing?
The verification technician
The contractor
The independent verification testing technician
None of the above
4. A full lot is composed of 5 sublots and 4 cores per lot False
T/F
5. What is the most important for consistent compaction The mix is uniform in tem-
of asphalt mix? perature
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction
6. Referring to general stationing guidelines, R1 would Both A and C
be ____ than R2
1/7
, Asphalt Paving Level 1
Study online at https://quizlet.com/_a09si7
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C
7. While using the rolling straightedge, if the needle goes Mark the pavement where
in the red zone indicating an unacceptable high spot in the needle first goes into
the section, you then the red zone and place an-
other mark where the nee-
dle leaves the red zone
and continue
8. For bridge approach slabs, the 15 foot manual 1 inch
straightedge should be set so ____ is on the bridge
deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above
9. For the first transverse joint on a project place the 15 foot manual straight
___ on the new pavement while overlapping the trans- edge
verse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above
10. When calibrating to check the low side of the rolling Place a 3/16 inch shin un-
straight edge: der each outside wheel,
Place shims under the outer wheels the gauge should read
Place the rolling straight edge on a surface that looks zero on both sides of the
flat gauge
2/7
Asphalt Paving Level 1
2025 verified graded A+ already passed!
Study online at https://quizlet.com/_a09si7
1. A full lot of super pave asphalt is what size? 2000 to 4000 tons
1,000 tons
1,000 to 2000 tons
2000 to 4000 tons
1 days production
2. Which is not typically used as an asphalt binder in fdot PG 62-22
mix designs?
PG 52-28
PG 58-22
PG 62-22
PG 76-22(PMA)
PG 82-22 (PMA)
3. Who cuts the density cores used for verification test- The contractor
ing?
The verification technician
The contractor
The independent verification testing technician
None of the above
4. A full lot is composed of 5 sublots and 4 cores per lot False
T/F
5. What is the most important for consistent compaction The mix is uniform in tem-
of asphalt mix? perature
The mix is hotter in temperature
The mix is colder in temperature
The mix is uniform in temperature
Temperature of the mix does not affect compaction
6. Referring to general stationing guidelines, R1 would Both A and C
be ____ than R2
1/7
, Asphalt Paving Level 1
Study online at https://quizlet.com/_a09si7
Closer to centerline
Closer to outside shoulder
Closure to the inside shoulder
Both A and C
7. While using the rolling straightedge, if the needle goes Mark the pavement where
in the red zone indicating an unacceptable high spot in the needle first goes into
the section, you then the red zone and place an-
other mark where the nee-
dle leaves the red zone
and continue
8. For bridge approach slabs, the 15 foot manual 1 inch
straightedge should be set so ____ is on the bridge
deck.
1 inch
Exactly 1/2 of the straightedge
The entire straightedge
None of the above
9. For the first transverse joint on a project place the 15 foot manual straight
___ on the new pavement while overlapping the trans- edge
verse joint by one inch.
4 foot level
15 foot manual straight edge
Rolling straightedge
All the above
10. When calibrating to check the low side of the rolling Place a 3/16 inch shin un-
straight edge: der each outside wheel,
Place shims under the outer wheels the gauge should read
Place the rolling straight edge on a surface that looks zero on both sides of the
flat gauge
2/7