• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

CISEC Exam Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Document preview thumbnail
Preview 2 out of 15 pages

CISEC Exam Comprehensive Questions (Frequently Tested) with Verified Answers Graded A+

Content preview

CISEC Exam Comprehensive Questions
(Frequently Tested) with Verified
Answers Graded A+

LDP - Answer: Land Developing Projects - altering landscape for projects such as agriculture or
housing ect.



NPDES - Answer: National Pollutant Discharge Elimination System



- section of the CWA (Clean Water Act) to permit stormwater discharges associated w industrial
activities PER permit



CWA Penalty Types - Answer: Adminstrative

Class I. Neglegent

Class II. Knowlingly = greater fines



What documents are required on site? - Answer: - SWPPP

- CGP

- Site Map

- Drawings and Key

- All inspection reports

- Any amendments to SWPPP

, Who is the "operator"? Also the LRP. - Answer: Usually the OWNER of the site, not the
contractor, unless authorized by the owner to general contractor to have day-to-day operational
control!



When do you need permit coverage? - Answer: Required from start to end of project. "End"
being the final vegetative/non-vegetative (concrete) stabilization occuring.



For any project one acre or greater.



Large Land Development - Answer: -strips off all existing vegetation a.k.a site carving

-usually on hillsides and steep slopes

-installation of untilities that tear up large areas of land



Vertical Projects - Answer: - Homebuilding, smaller residence construction projects

-usually multiple subcontractors

-requires lots of housekeeping = mass choas



Bix Box Projects - Answer: -commercial buildings

-mass grading and mass choas

-highly visible w/ fairly large footprint



Linear Projects - Answer: -roadways, utilities, and stream corridors

-long narrow sites and mass choas

-limites site access and continually changing (high activity)



What is erosion? - Answer: The process by which soil particle get displaced by the act of wind of
water.

Document information

Uploaded on
July 13, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
YourExamplug
4.1
(74)
Sold
223
Followers
27
Items
18055
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions