Texas Mold Remediation Contractor Exam
| Questions and Answers Rated A+ |
2025/2026 Guide
Recommended method for cleaning hard surfaces
- Correct Answer - HEPA vacuuming followed by wet cleaning.
Handling heavily contaminated porous materials
- Correct Answer - They should be removed and disposed of.
Use of EPA-registered cleaning products
- Correct Answer - Ensures proper efficacy and safety when used as
directed.
Mold remediation protocol
- Correct Answer - A written document outlining specific methods,
containment, and clearance criteria.
Developer of mold remediation protocol
- Correct Answer - Typically a licensed mold assessment consultant.
Post-remediation assessment timing
- Correct Answer - Conducted after remediation work is complete, before
reoccupancy.
Remediation work plan
, - Correct Answer - Provides specific instructions and standardized
procedures for executing the remediation.
Importance of documenting pre-remediation conditions
- Correct Answer - Establishes a baseline for measuring remediation
success.
Equipment for negative air pressure
- Correct Answer - Commonly negative air machines.
Purpose of dehumidifiers during remediation
- Correct Answer - To reduce moisture and help dry the area.
Disposal of mold-contaminated waste
- Correct Answer - Bagged in heavy-duty plastic bags and disposed of
per local regulations.
Benefit of separating clean and dirty zones
- Correct Answer - Minimizes the risk of cross-contamination.
Action if additional mold is found
- Correct Answer - The remediation plan must be adjusted and additional
work performed.
Role of engineering controls during remediation
- Correct Answer - Reduce airborne contaminants and improve safety.
Importance of maintaining detailed work logs
| Questions and Answers Rated A+ |
2025/2026 Guide
Recommended method for cleaning hard surfaces
- Correct Answer - HEPA vacuuming followed by wet cleaning.
Handling heavily contaminated porous materials
- Correct Answer - They should be removed and disposed of.
Use of EPA-registered cleaning products
- Correct Answer - Ensures proper efficacy and safety when used as
directed.
Mold remediation protocol
- Correct Answer - A written document outlining specific methods,
containment, and clearance criteria.
Developer of mold remediation protocol
- Correct Answer - Typically a licensed mold assessment consultant.
Post-remediation assessment timing
- Correct Answer - Conducted after remediation work is complete, before
reoccupancy.
Remediation work plan
, - Correct Answer - Provides specific instructions and standardized
procedures for executing the remediation.
Importance of documenting pre-remediation conditions
- Correct Answer - Establishes a baseline for measuring remediation
success.
Equipment for negative air pressure
- Correct Answer - Commonly negative air machines.
Purpose of dehumidifiers during remediation
- Correct Answer - To reduce moisture and help dry the area.
Disposal of mold-contaminated waste
- Correct Answer - Bagged in heavy-duty plastic bags and disposed of
per local regulations.
Benefit of separating clean and dirty zones
- Correct Answer - Minimizes the risk of cross-contamination.
Action if additional mold is found
- Correct Answer - The remediation plan must be adjusted and additional
work performed.
Role of engineering controls during remediation
- Correct Answer - Reduce airborne contaminants and improve safety.
Importance of maintaining detailed work logs