The portion of total risk that remains after unacceptable risk has been determined is ________. -
CORRECT ANSWER Residual
An opposing force, condition, source, or circumstance with the potential to negatively impact
your mission and/or degrade the mission capability is a __________. - CORRECT
ANSWER Hazard
Risk to forces is the risk that could potentially damage or injure our forces (equipment and
personnel). - CORRECT ANSWER True
Individual units may keep files of their own tailored TRACS Assessments in a secure place other
than on the TRACS website. - CORRECT ANSWER True
__________ is the estimate of the likelihood that a hazard will cause an impact on an operation. -
CORRECT ANSWER Probability
Residual risk is the risk remaining after controls have been identified, selected, and implemented
for the hazard. - CORRECT ANSWER True
TRACS stands for _________. - CORRECT ANSWER Total Risk Assessment and
Control System
PPE falls into the category of _________ controls. - CORRECT ANSWER Physical
Supervisors need only concern themselves with attaining good ORM communication with their
subordinates, not what comes down from the upper chain-of-command. - CORRECT
ANSWER False