100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Test Bank Complete_ Information Technology Project Management 9th Edition, By Kathy Schwalbe All Chapters 1-11| Updated Edition With Detailed Answers| Rated A+

Puntuación
-
Vendido
-
Páginas
570
Grado
A+
Subido en
10-07-2025
Escrito en
2024/2025

This document contains the complete test bank for Information Technology Project Management by Kathy Schwalbe, 9th Edition. It includes multiple-choice questions with detailed and accurate answers for Chapters 1 through 11. The material is fully updated and ideal for exam preparation, quizzes, and practice throughout the course. Perfect for students aiming for top grades in project management coursework.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
10 de julio de 2025
Número de páginas
570
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Test Bank Complete_
Information Technology Project Management 9th Edition,
By Kathy Schwalbe
All Chapters 1-11| Updated Edition With Detailed Answers| Rated A+

,chapter 1. introduction to project management ------------------------------------------------------------ 3
chapter 2: the project management and information technology context ------------------------- 53
chapter 3. the project management process groups ---------------------------------------------------- 102
chapter 4. project integration management -------------------------------------------------------------- 148
chapter 5. project scope management --------------------------------------------------------------------- 192
chapter 6. project schedule management ----------------------------------------------------------------- 233
chapter 7. project cost management ------------------------------------------------------------------------ 284
chapter 8. project quality management -------------------------------------------------------------------- 336
chapter 9. project resource management ------------------------------------------------------------------ 379
chapter 10. project communications management ----------------------------------------------------- 425
chapter 11. project risk management ----------------------------------------------------------------------- 464

,chapter 1. introduction to project management
kathy schwalbe: information technology project management 9th edition, test bank



true / false


1. until the 1980s, project management primarily focused on providing schedule and
resource data to top management in the military, computer, and construction industries.
a. true
b. false


answer: true
feedback: until the 1980s, project management primarily focused on providing schedule
and resource data to top management in the military, computer, and construction
industries. today’s project management involves much more, and people in every
industry and every country manage projects.
points: 1
difficulty: difficulty: easy
references: p.2
learning objectives: info.schw.14.1 - lo: 1-1
national standards: united states - busprog: technology
topics: introduction
keywords: bloom's: knowledge


2. a difference between operations and projects is that operations end when their
objectives have been reached, whereas projects do not.
a. true
b. false


answer: false

, feedback: projects are different from operations in that they end when their objectives
have been reached or the project has been terminated.
points: 1
difficulty: difficulty: moderate
references: p.4
learning objectives: info.schw.14.2 - lo: 1-2
national standards: united states - busprog: analytic
topics: what is a project?
keywords: bloom's: comprehension


3. every project should have a well-defined objective.
a. true
b. false


answer: true
feedback: a project has a unique purpose. every project should have a well-defined
objective.
points: 1
difficulty: difficulty: easy
references: p.6
learning objectives: info.schw.14.2 - lo: 1-2
national standards: united states - busprog: analytic
topics: what is a project?
keywords: bloom's: knowledge


4. projects should be developed in increments.
a. true
b. false


answer: true
$15.00
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
DRjessicapeck
2.0
(1)

Conoce al vendedor

Seller avatar
DRjessicapeck NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
6
Miembro desde
1 año
Número de seguidores
0
Documentos
58
Última venta
2 meses hace

2.0

1 reseñas

5
0
4
0
3
0
2
1
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes