RTPM Study guide based on actual test with correct answers
|\ |\ |\ |\ |\ |\ |\ |\ |\
1.Technology Responsibility Matrix: The technology responsibility |\ |\ |\ |\ |\ |\
matrix in- cludes key information about furnishings, the statement of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
work, technology sys- tems, and technology spaces. It does not,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
however, include information about the commissioning or QA plans.
|\ |\ |\ |\ |\ |\ |\ |\ |\
(TPMRM, page 1-24) |\ |\
2.Integration Management: Covers the breakup of a larger project to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
multiple small projects or conversely running several small projects as
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
one . it also includes the integration of various sub-contractors into the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
organization under an integrated plan. |\ |\ |\ |\
3.Stakeholder management "Keep satisified": Client |\ |\ |\ |\ |\
President Financial sponsors |\ |\
cheif finance officer
|\ |\
|\ AHJ
general contractor. |\
4.Stakeholder management "Manage Closely": Board of |\ |\ |\ |\ |\ |\
directors client PM |\ |\
general contractor PM |\ |\
5.Stakenholder management "Monitor": |\ |\ |\
Architect Engineer |\
Sub contractors
|\ |\
Service providers |\
6.Stakeholder management "Keep Informed": design consultaint |\ |\ |\ |\ |\ |\
1 |\/ |\85
,(client) Department heads |\ |\
Community |\
advocates Client |\ |\
staff
Vendors |\
End user |\
7.OBS "Orgnization Breakdown Structure": Shows who is responsible for
|\ |\ |\ |\ |\ |\ |\ |\ |\
other team members. simular to a RACI chart regardless of the pay
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
scale or hierarchy
|\ |\
8.Work Breakdown Structure (WBS): It must cover the elements of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project's end product or deliverable and also all the elements of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project, including: |\
1 Planning
2 Implementing the project |\ |\
3 Closing out the project. |\ |\ |\
It should be as specific as possible.
|\ |\ |\ |\ |\ |\
9.Work Breakdown Structure (WBS) Level 1 first position: Represents
|\ |\ |\ |\ |\ |\ |\ |\ |\
the overall deliverable of the project.
|\ |\ |\ |\ |\
10.Work Breakdown Structure (WBS) Second position: Represents
|\ |\ |\ |\ |\ |\ |\
summary tasks within the overall deliverable or project.
|\ |\ |\ |\ |\ |\ |\
2 |\/ |\85
,11.Work Breakdown Structure (WBS) Third position: Represents work
|\ |\ |\ |\ |\ |\ |\ |\
pack- ages that are discrete activities within each summary task within
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the overall deliver- able of a project.
|\ |\ |\ |\ |\ |\
12.PERT developing a schedule finish to start: Finish -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Start Pulling cable can't start until installing conduit
|\ |\ |\ |\ |\ |\ |\ |\
finishes
13.PERT developing a schedule Finish - Finish: finish -
|\ |\ |\ |\ |\ |\ |\ |\ |\
finish Labeling outlets cannot finish until testing finishes
|\ |\ |\ |\ |\ |\ |\
14.PERT developing a schedule Start - Start: Start -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Start Bond basket tray cannot start until hang basket
|\ |\ |\ |\ |\ |\ |\ |\
|\ tray starts
|\
15.PERT developing a schedule Start - Finish: Start -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Finish install fiber can not finish until ordered fiber
|\ |\ |\ |\ |\ |\ |\ |\ |\
starts
16.What are the three estimates used in PERT for each activity?:
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Optimistic, Most Likely, |\ |\
Pessimistic
17.What does the Optimistic estimate represent in PERT?: Lowest
|\ |\ |\ |\ |\ |\ |\ |\ |\
projected cost or fastest time |\ |\ |\ |\
18.What does the Most Likely estimate represent in PERT?: Average
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project cost or time |\ |\ |\
19.What does the Pessimistic estimate represent in PERT?: Highest
|\ |\ |\ |\ |\ |\ |\ |\ |\
projected cost or longest timeframe |\ |\ |\ |\
20.PERT Calulation: (optimistic + (4 x Most Likey) + Pessimistic)/ 6 =
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
3 |\/ |\85
, 21.EVM (Earned Value Management): A methodology that combines
|\ |\ |\ |\ |\ |\ |\ |\
scope, schedule, and resource measurements to assess project
|\ |\ |\ |\ |\ |\ |\ |\
performance and progress. |\ |\
22.EVM (Earned Value Management) calulation: EVM = (percentage
|\ |\ |\ |\ |\ |\ |\ |\
complete x total project budget) |\ |\ |\ |\
23.Using budget to Determine project Performance: Once project has
|\ |\ |\ |\ |\ |\ |\ |\ |\
been started 2 areas will be monitored
|\ |\ |\ |\ |\ |\
EV and AC. |\ |\
24.EV (BCWP): The measure of work performed in terms of the budget
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
authorized for the work. (amount of work completed for the project)
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
formally known as BCWP |\ |\ |\
25.AC (ACWP): Is the realized cost incurred for the work performed on an
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
|\ activity durning a specific time period.
|\ |\ |\ |\ |\
26.Developing a Communication Plan: Mostly reports and tasks who's |\ |\ |\ |\ |\ |\ |\ |\ |\
account- able is not part of this process. |\ |\ |\ |\ |\ |\ |\
27.kickoff meeting: A meeting used to initiate the start of the project;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
typically attended by all the key stakeholders; can be done when
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Initiating or Planning is complete depending upon the organization. will
|\ |\ |\ |\ |\ |\ |\ |\ |\
|\ include contract documents such as the signed contract.
|\ |\ |\ |\ |\ |\ |\
4 |\/ |\85
|\ |\ |\ |\ |\ |\ |\ |\ |\
1.Technology Responsibility Matrix: The technology responsibility |\ |\ |\ |\ |\ |\
matrix in- cludes key information about furnishings, the statement of
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
work, technology sys- tems, and technology spaces. It does not,
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
however, include information about the commissioning or QA plans.
|\ |\ |\ |\ |\ |\ |\ |\ |\
(TPMRM, page 1-24) |\ |\
2.Integration Management: Covers the breakup of a larger project to
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
multiple small projects or conversely running several small projects as
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
one . it also includes the integration of various sub-contractors into the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
organization under an integrated plan. |\ |\ |\ |\
3.Stakeholder management "Keep satisified": Client |\ |\ |\ |\ |\
President Financial sponsors |\ |\
cheif finance officer
|\ |\
|\ AHJ
general contractor. |\
4.Stakeholder management "Manage Closely": Board of |\ |\ |\ |\ |\ |\
directors client PM |\ |\
general contractor PM |\ |\
5.Stakenholder management "Monitor": |\ |\ |\
Architect Engineer |\
Sub contractors
|\ |\
Service providers |\
6.Stakeholder management "Keep Informed": design consultaint |\ |\ |\ |\ |\ |\
1 |\/ |\85
,(client) Department heads |\ |\
Community |\
advocates Client |\ |\
staff
Vendors |\
End user |\
7.OBS "Orgnization Breakdown Structure": Shows who is responsible for
|\ |\ |\ |\ |\ |\ |\ |\ |\
other team members. simular to a RACI chart regardless of the pay
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
scale or hierarchy
|\ |\
8.Work Breakdown Structure (WBS): It must cover the elements of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project's end product or deliverable and also all the elements of the
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project, including: |\
1 Planning
2 Implementing the project |\ |\
3 Closing out the project. |\ |\ |\
It should be as specific as possible.
|\ |\ |\ |\ |\ |\
9.Work Breakdown Structure (WBS) Level 1 first position: Represents
|\ |\ |\ |\ |\ |\ |\ |\ |\
the overall deliverable of the project.
|\ |\ |\ |\ |\
10.Work Breakdown Structure (WBS) Second position: Represents
|\ |\ |\ |\ |\ |\ |\
summary tasks within the overall deliverable or project.
|\ |\ |\ |\ |\ |\ |\
2 |\/ |\85
,11.Work Breakdown Structure (WBS) Third position: Represents work
|\ |\ |\ |\ |\ |\ |\ |\
pack- ages that are discrete activities within each summary task within
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
the overall deliver- able of a project.
|\ |\ |\ |\ |\ |\
12.PERT developing a schedule finish to start: Finish -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Start Pulling cable can't start until installing conduit
|\ |\ |\ |\ |\ |\ |\ |\
finishes
13.PERT developing a schedule Finish - Finish: finish -
|\ |\ |\ |\ |\ |\ |\ |\ |\
finish Labeling outlets cannot finish until testing finishes
|\ |\ |\ |\ |\ |\ |\
14.PERT developing a schedule Start - Start: Start -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Start Bond basket tray cannot start until hang basket
|\ |\ |\ |\ |\ |\ |\ |\
|\ tray starts
|\
15.PERT developing a schedule Start - Finish: Start -
|\ |\ |\ |\ |\ |\ |\ |\ |\
Finish install fiber can not finish until ordered fiber
|\ |\ |\ |\ |\ |\ |\ |\ |\
starts
16.What are the three estimates used in PERT for each activity?:
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Optimistic, Most Likely, |\ |\
Pessimistic
17.What does the Optimistic estimate represent in PERT?: Lowest
|\ |\ |\ |\ |\ |\ |\ |\ |\
projected cost or fastest time |\ |\ |\ |\
18.What does the Most Likely estimate represent in PERT?: Average
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\
project cost or time |\ |\ |\
19.What does the Pessimistic estimate represent in PERT?: Highest
|\ |\ |\ |\ |\ |\ |\ |\ |\
projected cost or longest timeframe |\ |\ |\ |\
20.PERT Calulation: (optimistic + (4 x Most Likey) + Pessimistic)/ 6 =
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
3 |\/ |\85
, 21.EVM (Earned Value Management): A methodology that combines
|\ |\ |\ |\ |\ |\ |\ |\
scope, schedule, and resource measurements to assess project
|\ |\ |\ |\ |\ |\ |\ |\
performance and progress. |\ |\
22.EVM (Earned Value Management) calulation: EVM = (percentage
|\ |\ |\ |\ |\ |\ |\ |\
complete x total project budget) |\ |\ |\ |\
23.Using budget to Determine project Performance: Once project has
|\ |\ |\ |\ |\ |\ |\ |\ |\
been started 2 areas will be monitored
|\ |\ |\ |\ |\ |\
EV and AC. |\ |\
24.EV (BCWP): The measure of work performed in terms of the budget
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
authorized for the work. (amount of work completed for the project)
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
formally known as BCWP |\ |\ |\
25.AC (ACWP): Is the realized cost incurred for the work performed on an
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
|\ activity durning a specific time period.
|\ |\ |\ |\ |\
26.Developing a Communication Plan: Mostly reports and tasks who's |\ |\ |\ |\ |\ |\ |\ |\ |\
account- able is not part of this process. |\ |\ |\ |\ |\ |\ |\
27.kickoff meeting: A meeting used to initiate the start of the project;
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
typically attended by all the key stakeholders; can be done when
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
Initiating or Planning is complete depending upon the organization. will
|\ |\ |\ |\ |\ |\ |\ |\ |\
|\ include contract documents such as the signed contract.
|\ |\ |\ |\ |\ |\ |\
4 |\/ |\85