• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

CESSWI Part 2 Exam Questions And Answers

Document preview thumbnail
Preview 2 out of 14 pages

CESSWI Part 2 Exam Questions And Answers /. Descri and Purp of Existing Veg - Answer-temp or perm bmp desi to stab soil and remove sups part from sheet flow runoff. /.Object of Existing Veg - Answer-1) Site Plan and Mang 2) Erosi Cont 3) Sedi Cont 4) Post-Cons Mang /.Targ Pollut of Existing Veg - Answer-1) Sed 2) nutri 3) Hydro carb/ petrol prod 4) turbidity /.Appli of Existing Veg - Answer-1) Areas within site where no const activity is occur 2) Areas where local, state and fed govt require preservation 3) Areas where existing veg can be utilized for eros, sedi, and storm water quality. /.limitations of Existing Veg - Answer-1) arid and semi-arid regions may have little to no veg to work with. 2) amount of veg that may be press may be limited by size of prop 3) limited access for maint /.Implementation considerations for existing veg - Answer-1) existing veg should be maint where ever possible /.Existing veg: inspection - Answer-1) Accord to regu timetables 2) erosi and damage veg 3) sufficient moisture to ensure growth 4) veg is well stab 5) adequate cover 6) debris and litter 7) invasive exotics /.Existing veg: maint - Answer-1) only disturb area for construct 2)irrigate dry seasons 3) remove see, and replant if need be 4) replant or rework buffer strips 5) mow and cut perennial weeds 6) remove all trash and debri 7) treat invasive and noxious species /.existing veg :potentially associated - Answer-1) swales 2) riparian /.Sched/Sequ: purp & descrip - Answer-Temp, procedural control that involves creating a written plan to address neck bmps and sequencing of construct activities to mitigate the erosive effects of wind,water and construct activities. /.Sched/Sequ: object - Answer-1) site planning & management 2) erosion control 3) sediment control /.Sched/Sequ: targeted pollutants - Answer-1) sediment /.Sched/Sequ: applications - Answer-1) develop timetables for certain activities, paretic during rainy season /.Sched/Sequ: limit - Answer-1) not following ached /.Sched/Sequ: impl consid - Answer-1) Develop timetables for certain activities 2) Writtien detail soil diet acti as well as bmps to control run off 3) Stabilize as soon as possible. /.Sched/Sequ: inspect - Answer-1) inclusion of sched/seq as a bmp in the plan 2) ached site activities mirroring ached activites. /.Sched/Sequ: maintanence - Answer-1) modify ached of active when changes are warranted 2) modify ached of active prior to rainy season to reflect updated bmp info /.Sched/Sequ: potentially associated bmps - Answer-1) all bmps /.Hydroseed: Des& purp - Answer-Temp or perm bmp designed to reduce erosion and runoff by applying mix of seed, fert and stabilizing emulsion. /.Hydroseed: object - Answer-1) erosion control 2) good housekeeping/ materials management 3) post construct management /.Hydroseed: targeted pollut - Answer-1) sediment 2) nutrients 3) metals 4) ph /.Hydroseed: imp consid - Answer-1) need adequate

Content preview

CESSWI Part 2 Exam Questions And
Answers

/. Descri and Purp of Existing Veg - Answer-temp or perm bmp desi to stab soil and
remove sups part from sheet flow runoff.

/.Object of Existing Veg - Answer-1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang

/.Targ Pollut of Existing Veg - Answer-1) Sed
2) nutri
3) Hydro carb/ petrol prod
4) turbidity

/.Appli of Existing Veg - Answer-1) Areas within site where no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and storm water quality.

/.limitations of Existing Veg - Answer-1) arid and semi-arid regions may have little to no
veg to work with.
2) amount of veg that may be press may be limited by size of prop
3) limited access for maint

/.Implementation considerations for existing veg - Answer-1) existing veg should be
maint where ever possible

/.Existing veg: inspection - Answer-1) Accord to regu timetables
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics

/.Existing veg: maint - Answer-1) only disturb area for construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri

, 7) treat invasive and noxious species

/.existing veg :potentially associated - Answer-1) swales
2) riparian

/.Sched/Sequ: purp & descrip - Answer-Temp, procedural control that involves creating
a written plan to address neck bmps and sequencing of construct activities to mitigate
the erosive effects of wind,water and construct activities.

/.Sched/Sequ: object - Answer-1) site planning & management
2) erosion control
3) sediment control

/.Sched/Sequ: targeted pollutants - Answer-1) sediment

/.Sched/Sequ: applications - Answer-1) develop timetables for certain activities, paretic
during rainy season

/.Sched/Sequ: limit - Answer-1) not following ached

/.Sched/Sequ: impl consid - Answer-1) Develop timetables for certain activities
2) Writtien detail soil diet acti as well as bmps to control run off
3) Stabilize as soon as possible.

/.Sched/Sequ: inspect - Answer-1) inclusion of sched/seq as a bmp in the plan
2) ached site activities mirroring ached activites.

/.Sched/Sequ: maintanence - Answer-1) modify ached of active when changes are
warranted
2) modify ached of active prior to rainy season to reflect updated bmp info

/.Sched/Sequ: potentially associated bmps - Answer-1) all bmps

/.Hydroseed: Des& purp - Answer-Temp or perm bmp designed to reduce erosion and
runoff by applying mix of seed, fert and stabilizing emulsion.

/.Hydroseed: object - Answer-1) erosion control
2) good housekeeping/ materials management
3) post construct management

/.Hydroseed: targeted pollut - Answer-1) sediment
2) nutrients
3) metals
4) ph

/.Hydroseed: imp consid - Answer-1) need adequate moisture

Document information

Uploaded on
July 7, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam
3.4
(29)
Sold
159
Followers
7
Items
8423
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions