NERC PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+RECENT VERSION 1. How much load reduction to change frequency - answer 6-10% Load reduction = 1HZ Frequency change same direction 2. Largest Load block to pick up during sys resto - answer 5% of online generation 3. Ratio of Voltage change to load change - answer 5% change in Voltage=3% change in load (distribution only) 4. Power Losses on Line - answer I squared * R 5. DOE Reporting Conditions - answer 300 MW uncontrolled loss of load 100MW Firm load shed 50,000 customers out of power greater than 1 hr 3% Voltage reduction Public appeals to reduce load vandalism, sabotage 6. Time requirements for DOT reporting - answer 60 minutes for initial report 48 hrs for followup report 7. NERC reporting time requirements - answer 24 hrs normal 72 hrs IROL violoation for intial 60 Days final report 8. How often must a black start gen be tested - answer every 5 years 9. How often must a sys resto plan be reviewed/updated - answer every 1 year 10. How often must sys resto plan be tested - answer every 3 years (really not sure about this one) 11. Who is responsible for creating a sys resto plan - answer TOP 12. how often is ACE calculated - answer every 6 seconds (have seen 4) 13. ratio of frequency change to load change - answer 1% change in frequency = 2% change in load (approx. depending on reactive nature of load) 14. transmission voltages - answer 765, 500, 345,230,138, 115 kv 15. distribution voltages - answer 240, 120, 4, 13, 26, 69 kv 16. how long does a gen have to restart after shutdown without full restart process - answer 30 minutes 17. allowable voltage variation during sys restoration - answer +/- 10% 18. allowable voltage variation during normal conditions - answer +/- 5% 19. allowable frequency variation during system resto - answer 59.75 hz - 61 hz (also saw 59.5 hz) 20. power transfer - answer ((V1*V2)*sin power angle)/Xsubl 21. What voltage is considered part of the BES - answer 100 kV or higher 22. Number of required emergency ops training hours for sys operators - answer 32 hrs 23. Formula for redispatching generation (only for balancing) - answer MW relief required/(GDF GenA-GDF GenB)=change in GenB output 24. Minimum Torque angle for power to start flowing - answer 10 degrees 25. Minimum Frequncy Bias setting for BA - answer 1% of estimated peak demand for next year or 1% of estimated peak generation for next year if not load serving 26. CPS1 requirement - answer greater than or equal to 100% for rolling 12 month period 27. CPS 2 requirement - answer greater than or equal to 90% for month (10 minute intervals) 28. What level of disturbance is reportable for DCS - answer 80% of MSST 29. DCS requirement to return to pre disturbance condition - answer 15 minutes 30. DCS requirement for recovery period - answer 90 minutes after the end of disturbance period 31. time error correction - answer 1) +/- .02 hz to Fs 2) 20% of B added to NIs if unable to perform frequency adjustment 32. amount of interchange transaction intermediate BAs receive for losses - answer 3% of transaction 33. how long does BA have to submit emergency RFI - answer 60 minutes 34. length of time deficient BA can use assistance from reserve sharing group before must sumbit RFI - answer 60 minutes 35. time Interchange Authority has to distribute arranged interchange - answer 1 minute

Show more Read less
Institution
NERC
Course
NERC

Content preview

NERC
PRACTICE EXAM QUESTIONS
WITH CORRECT DETAILED
ANSWERS | ALREADY GRADED
A+<RECENT VERSION>



1. How much load reduction to change frequency - answer 6-10% Load
reduction = 1HZ Frequency change same direction


2. Largest Load block to pick up during sys resto - answer 5% of online
generation


3. Ratio of Voltage change to load change - answer 5% change in
Voltage=3% change in load (distribution only)


4. Power Losses on Line - answer I squared * R


5. DOE Reporting Conditions - answer 300 MW uncontrolled loss of
load
100MW Firm load shed
50,000 customers out of power greater than 1 hr
3% Voltage reduction
Public appeals to reduce load
vandalism, sabotage

,6. Time requirements for DOT reporting - answer 60 minutes for initial
report
48 hrs for followup report


7. NERC reporting time requirements - answer 24 hrs normal 72 hrs
IROL violoation for intial
60 Days final report


8. How often must a blackstart gen be tested - answer every 5 years


9. How often must a sys resto plan be reviewed/updated - answer every 1
year


10.How often must sys resto plan be tested - answer every 3 years (really
not sure about this one)


11.Who is responsible for creating a sys resto plan - answer TOP


12.how often is ACE calculated - answer every 6 seconds (have seen 4)


13.ratio of frequency change to load change - answer 1% change in
frequency = 2% change in load (approx. depending on reactive nature of
load)


14.transmission voltages - answer 765, 500, 345,230,138, 115 kv


15.distribution voltages - answer 240, 120, 4, 13, 26, 69 kv

,16.how long does a gen have to restart after shutdown without full restart
process - answer 30 minutes


17.allowable voltage variation during sys restoration - answer +/- 10%


18.allowable voltage variation during normal condtions - answer +/- 5%


19.allowable frequency variation during system resto - answer 59.75 hz -
61 hz (also saw 59.5 hz)


20.power transfer - answer ((V1*V2)*sin power angle)/Xsubl


21.What voltage is considered part of the BES - answer 100 kV or higher


22.Number of required emergency ops training hours for sys operators -
answer 32 hrs


23.Formula for redispatching generation (only for balancing) - answer
MW relief required/(GDF GenA-GDF GenB)=change in GenB output


24.Minimum Torque angle for power to start flowing - answer 10 degrees


25.Minimum Frequncy Bias setting for BA - answer 1% of estimated
peak demand for next year or 1% of estimated peak generation for next
year if not load serving


26.CPS1 requirement - answer greater than or equal to 100% for rolling
12 month period

, 27.CPS 2 requirement - answer greater than or equal to 90% for month
(10 minute intervals)


28.What level of disturbance is reportable for DCS - answer 80% of
MSST


29.DCS requirement to return to pre disturbance condition - answer 15
minutes


30.DCS requirement for recovery period - answer 90 minutes after the
end of disturbance period


31.time error correction - answer 1) +/- .02 hz to Fs
2) 20% of B added to NIs if unable to perform frequency adjustment


32.amount of interchange transaction intermediate BAs receive for losses -
answer 3% of transaction


33.how long does BA have to submit emergency RFI - answer 60
minutes


34.length of time deficient BA can use assistance from reserve sharing group
before must sumbit RFI - answer 60 minutes


35.time Interchange Authority has to distribute arranged interchange -
answer 1 minute

Written for

Institution
NERC
Course
NERC

Document information

Uploaded on
July 5, 2025
Number of pages
38
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
jervismuthami Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
10
Member since
1 year
Number of followers
0
Documents
573
Last sold
2 months ago

4.5

2 reviews

5
1
4
1
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions