True / False
1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
1
Difficulty: Easy
p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
Introduction
KEYWORDS:
Bloom's: Knowledge
2. A difference between operations and projects is that operations end when their objectives have been
reached, whereas projects do not.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
1
Difficulty: Moderate
p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Comprehension
3. Every project should have a well-defined objective.
a. True
Page 2 of 416
2
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
1
Difficulty: Easy
p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Knowledge
4. Projects should be developed in increments.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
1
Difficulty: Moderate
p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Comprehension
5. Resources in a project should be used effectively because they are limited.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
1
Difficulty: Moderate
p. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Comprehension
Page 3 of 416
3
6. A project manager’s primary role is to provide the funding for a project.
a. True
b. False
ANSWER:
False
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
Feedback: A project sponsor usually provides the direction and funding for a project.
1
Difficulty: Easy
p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Knowledge
7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: A project involves uncertainty. Every project is unique and thus it is
sometimes difficult to define its objectives clearly, estimate how long it will take to
complete, or determine how much it will cost. This uncertainty is one of the main
reasons project management is so challenging.
1
Difficulty: Moderate
p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Comprehension
8. Questions about how a team will track schedule performance is related to a project’s scope.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Project scope deals with questions such as, “What work will be done as
part of the project?”, “What unique product, service, or result does the customer or
sponsor expect from the project?”, or “How will the scope be verified?”
1
Difficulty: Moderate
p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology
Page 3 of 416
4
TOPICS:
KEYWORDS:
What is a Project?
Bloom's: Comprehension
9. In order to be realistic, a project manager should always set discrete goals instead of a range of
objectives.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Projects involve uncertainty and limited resources. Thus they rarely finish
according to their original scope, time, and cost goals. Instead of discrete target
goals, it is often more realistic to set a range of goals.
1
Difficulty: Moderate
p.8
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Comprehension
10. Managing the triple constraint primarily involves making trade-offs between resources and quality.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Managing the triple constraint involves making trade-offs
between scope, time, and cost goals for a project. Experienced project
managers know that one must decide which aspect of the triple constraint is
most important.
1
Difficulty: Easy
p.9
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is a Project?
KEYWORDS:
Bloom's: Knowledge
11. The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a
project.
a. True
b. False
ANSWER:
False
Page 4 of 416
5
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
Feedback: Project managers must strive not only to meet specific scope, time, cost,
and quality goals of projects but also facilitate the entire process to meet the needs
and expectations of people involved in project activities or affected by them.
1
Difficulty: Moderate
p.9
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
KEYWORDS:
What is Project Management?
Bloom's: Comprehension
12. A project’s stakeholders includes its customers, users, and suppliers.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Stakeholders are the people involved in or affected by project activities,
and include the project sponsor, project team, support staff, customers, users,
suppliers, and even opponents of a project.
1
Difficulty: Moderate
p.10
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Comprehension
13. Opponents of a project do not belong to the category of stakeholders.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Stakeholders are the people involved in or affected by project activities,
and include the project sponsor, project team, support staff, customers, users,
suppliers, and even opponents of a project.
1
Difficulty: Moderate
p.10
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Comprehension
14. The importance of stakeholders’ needs and expectations is limited to the beginning of a project.
Page 5 of 416
6
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Stakeholders’ needs and expectations are important in the beginning and
throughout the life of a project. Successful project managers develop good
relationships with project stakeholders to understand and meet their needs and
expectations.
1
Difficulty: Moderate
p.11
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
KEYWORDS:
What is Project Management?
Bloom's: Comprehension
15. Project procurement management primarily involves identifying stakeholder needs while managing
their engagement throughout the life of the project.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Project management knowledge areas describe the key competencies that
project managers must develop. Project procurement management involves
acquiring or procuring goods and services for a project from outside the performing
organization.
1
Difficulty: Moderate
p.12
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Comprehension
16. The primary role of project stakeholder management is to ensure that the project will satisfy the stated
needs for which it was undertaken.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
False
Feedback: Project management knowledge areas describe the key
competencies that project managers must develop. Project stakeholder
management includes identifying and analyzing stakeholder needs while
managing and controlling their engagement throughout the life of the project.
1
Difficulty: Moderate
Page 6 of 416
7
REFERENCES:
p.12
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
KEYWORDS:
What is Project Management?
Bloom's: Comprehension
17. Project human resource management is concerned with making effective use of the people involved
with a project.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Project management knowledge areas describe the key competencies that
project managers must develop. Project human resource management is concerned
with making effective use of the people involved with the project.
1
Difficulty: Moderate
p.12
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Comprehension
18. Stakeholder analyses, work requests, and project charters are tools used in integration management.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Project selection methods, project management methodologies,
stakeholder analyses, work requests, and project charters are some of the tools used
in integration management.
1
Difficulty: Easy
p.13
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
19. Earned value management is a tool primarily used in human resource management.
a. True
b. False
ANSWER:
False
Page 7 of 416
8
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
Feedback: Project budgets, net present value, return on investment, payback
analysis, and earned value management are tools used in cost management.
1
Difficulty: Easy
p.13
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
20. Responsibility assignment matrices and project organizational charts are examples of tools used in
procurement management.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Motivation techniques, empathic listening, responsibility assignment
matrices, project organizational charts, and team building exercises are tools used in
human resource management.
1
Difficulty: Easy
p.13
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
21. Maturity models, statistical methods, and test plans are examples of tools used in quality management.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Quality metrics, maturity models, statistical methods, and test plans are
some of the tools used in quality management.
1
Difficulty: Easy
p.13
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
22. According to a 2013 CHAOS study, user involvement is the most important factor that contributes to
the success of IT projects.
Page 8 of 416
9
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Executive support is the most important factor, followed by user
involvement.
1
Difficulty: Easy
p.16
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
23. Project managers work with the project sponsors to define success for particular projects.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Project managers work with the project sponsors, the project
team, and other stakeholders to meet project goals. They also work with
sponsors to define success for particular projects.
1
Difficulty: Easy
p.17
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS:
What is Project Management?
KEYWORDS:
Bloom's: Knowledge
24. Good project managers assume that their definition of success is the same as the sponsors.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Good project managers do not assume that their definition of
success is the same as the sponsors. They take the time to understand their
sponsors’ expectations and then track project performance based on
important success criteria.
1
Difficulty: Moderate
p.17
LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1-3
NATIONAL STANDARDS: United States - BUSPROG: Analytic
Page 9 of 416
10
TOPICS:
KEYWORDS:
What is Project Management?
Bloom's: Comprehension
25. Program managers are change agents.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
True
Feedback: Program managers are responsible for more than the delivery of
project results. They are change agents responsible for the success of
products and processes developed by these projects.
1
Difficulty: Moderate
p.18
LEARNING OBJECTIVES: INFO.SCHW.14.4 - LO: 1-4
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
Program and Project Portfolio Management
KEYWORDS:
Bloom's: Comprehension
26. Effective program managers recognize that managing a project is much more complex than managing
a program.
a. True
b. False
ANSWER:
RATIONALE:
POINTS:
DIFFICULTY:
REFERENCES:
False
Feedback: Effective program managers recognize that managing a program
is much more complex than managing a single project.
1
Difficulty: Moderate
p.18
LEARNING OBJECTIVES: INFO.SCHW.14.4 - LO: 1-4
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS:
Program and Project Portfolio Management
KEYWORDS:
Bloom's: Comprehension
27. Individual projects always address strategic goals whereas portfolio management addresses tactical
goals.
a. True
b. False
ANSWER:
RATIONALE:
False
Feedback: Tactical goals are generally more specific and short-term than
strategic goals, which emphasize long-term goals for an organizati
Content preview
TEST BANK For Information Technology
Project Management 9th Edition
Kathy Schwalbe, Verified Chapters
Page 1 of 416
,True / False
1. Until the 1980s, project management primarily focused on providing schedule and resource data to top
management in the military, computer, and construction industries.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing
schedule and resource data to top management in the military, computer, and
construction industries. Today’s project management involves much more, and
people in every industry and every country manage projects.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.2
LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1-1
NATIONAL STANDARDS: United States - BUSPROG: Technology
TOPICS: Introduction
KEYWORDS: Bloom's: Knowledge
2. A difference between operations and projects is that operations end when their objectives have been
reached, whereas projects do not.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Projects are different from operations in that they end when their
objectives have been reached or the project has been terminated.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.4
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension
3. Every project should have a well-defined objective.
a. True
Page 2 of 416
,2
b. False
ANSWER: True
RATIONALE: Feedback: A project has a unique purpose. Every project should have a well-defined
objective.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge
4. Projects should be developed in increments.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often
defined broadly when they begin, and as time passes, the specific details of the
project become clearer. Therefore, projects should be developed in increments.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.6
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension
5. Resources in a project should be used effectively because they are limited.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project requires resources, often from various areas. Resources,
however, are limited and must be used effectively to meet project and other
corporate goals.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p. 7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension
Page 3 of 416
, 3
6. A project manager’s primary role is to provide the funding for a project.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project.
POINTS: 1
DIFFICULTY: Difficulty: Easy
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Knowledge
7. One of the main reasons why project management is challenging is because of the factor of uncertainty.
a. True
b. False
ANSWER: True
RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is
sometimes difficult to define its objectives clearly, estimate how long it will take to
complete, or determine how much it will cost. This uncertainty is one of the main
reasons project management is so challenging.
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Analytic
TOPICS: What is a Project?
KEYWORDS: Bloom's: Comprehension
8. Questions about how a team will track schedule performance is related to a project’s scope.
a. True
b. False
ANSWER: False
RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as
part of the project?”, “What unique product, service, or result does the customer or
sponsor expect from the project?”, or “How will the scope be verified?”
POINTS: 1
DIFFICULTY: Difficulty: Moderate
REFERENCES: p.7
LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1-2
NATIONAL STANDARDS: United States - BUSPROG: Technology
Page 3 of 416