A project estimator is developing a cost
estimate for construction of a new diag-
nostic imaging wing. The projected costs
are:
Fixed equipment installation charges
$700,000
Site isolation $50,000
1,600,000
Annual utilities $425,000
Construction materials $1,200,000
Portable equipment $900,000
Annual depreciation $275,000
What are the expected contractor ex-
penses?
Which of the following contribute to typi-
cal general contractor fees:
1. Permit and inspection fees
2, 3, and 4
2. General conditions
3. Overhead and profit
4. Site condition assessment fees
Demand side management (DSM) pro-
grams are developed and offered to or-
Provide emergency energy demand
ganizations by energy providers to do
sources
which of the following during peak ser-
vice?
When developing a preventive main-
tenance program, a facility manager
should ensure that an annual test is con-
, CHFM Verified Multiple Choice and Conceptual Actual Final Exam Questions With
Reviewed 100% Correct Detailed Answers
>> Guaranteed Pass!!Current Update
ducted on every required battery-pow-
ered lighting system. This test should be 30 seconds
run for NOT less than:
In existing facilities, doors that open onto
exit corridors should have 1-3/4 inch sol-
20 minutes
id bonded wood core or be of construc-
tion that resists fire for NOT less than:
Total dissolved solids in a cooling tower
Variable speed drive fans
are regulated by:
What contracts requires a schedule of
Guaranteed maximum price
values when negotiating?
A project has a budget of $6,600,000.
Planning and design fees are estimated
at $700,000 and construction expenses
580,000
are estimated at $5,100,000. What is the
amount of a 10% construction contin-
gency?
The Joint Commission standards require
that an organization develop and imple-
ment a policy to prohibit smoking except
in specified circumstances. The standard
is intended to reduce risks of:
1. Possible adverse effects on care, treat-
2, 3, and 4
ment, and services to people who smoke
2. Passive smoke to others
3. Fire
4. False alarms
When planning demolition, construc-
tion, or renovation, an organization se-
lects and implements proper controls
to reduce risk and minimize the impact
of these activities on infection control.
Which of the following are proper con-
, CHFM Verified Multiple Choice and Conceptual Actual Final Exam Questions With
Reviewed 100% Correct Detailed Answers
>> Guaranteed Pass!!Current Update
trols within the construction area:
1. Providing negative air machines
2. Installing dust barriers 2, 3, and 4
3. Wet-mopping the floors
4. Ensuring debris-free job site
A facility is installing an air intake for a
medical air compressor. What is the min-
5
imum heights, in ft., at which this should
be located above the ground?
When using a load bank to perform a
load test on an Emergency Power Sup-
ply System (EPSS) because the monthly
30 minutes
test could not achieve 30% of the name
plate load rating, the test is run for a
minimum of:
The process of a hospital construction
project close-out by the contractor in-
cludes:
1. A punch list
1, 2, and 3
2. Operations and maintenance manuals
3. As-built construction drawings
4. Final cleaning to be readied for patient
use
Occupancy separations, such as busi-
ness occupancy from a healthcare oc-
cupancy, are permitted provided the ser- 2 hours
vices are separated by partitions that are
minimally rated: