How far do 2 pieces of on track equipment need to stay away from one another while
performing work? 40 feet, in some cases RWIC can allow them to work closer together
Who can give permission for another work group to occupy their working limits? RWIC
When another work group is occupying the RWIC's working limits they must fill out.... form-
O
When working with another work group the RWIC cannot release their working limits until....
the EIC reports clear
What must happen if a work group wants to occupy the working limits of another work group?
EIC of the requesting work group must have a job briefing with the RWIC of the working
limits
If an RWIC has an EIC's work group within his limits (Joint occupancy), when can the RWIC
release the working limits? Once the EIC has reported clear of the working limits
When transferring authority to another RWIC, what does the current RWIC have to ensure?
All workers and equipment is clear of the tracks
When crossing tracks you should.... Stop and look both ways, cross directly over the tracks
at 90 degrees, do not step on the rail, do not cross if you cannot safely
A train traveling at 125mph can take up to how long to stop in case of emergency? 2 miles
How far do 2 pieces of standing equipment have to be away from one another in order for a
roadway worker to cross between them? 50 feet
, When should a roadway worker use the Good Faith Challenge? When they feel a directive
will violate an operating or safety rule
type of working limits on controlled track foul time, exclusive track occupancy
type of working limits on non-controlled track inaccessible track
type of train approach warning watchman
type of train approach warning individual train detection
What type of work roadway workers do? inspection and construction of track, maintenance
of bridges, repair of signal and communication systems, repair of RMM
Can fouling a track apply to both people and machinery? Yes
Within what distance to the track is a roadway worker considered fouling it? 4 feet from the
nearest running rail
Who authorizes movements on controlled track? Operator/Dispatcher
The RWIC is required to be qualified on physical characteristics when their group is working
on.... All tracks
The EIC is an employee who is in charge of.... A work group
How far do 2 pieces of on track equipment need to stay away from one another while
performing work? 40 feet, in some cases RWIC can allow them to work closer together
Who can give permission for another work group to occupy their working limits? RWIC
When another work group is occupying the RWIC's working limits they must fill out.... form-
O
When working with another work group the RWIC cannot release their working limits until....
the EIC reports clear
What must happen if a work group wants to occupy the working limits of another work group?
EIC of the requesting work group must have a job briefing with the RWIC of the working
limits
If an RWIC has an EIC's work group within his limits (Joint occupancy), when can the RWIC
release the working limits? Once the EIC has reported clear of the working limits
When transferring authority to another RWIC, what does the current RWIC have to ensure?
All workers and equipment is clear of the tracks
When crossing tracks you should.... Stop and look both ways, cross directly over the tracks
at 90 degrees, do not step on the rail, do not cross if you cannot safely
A train traveling at 125mph can take up to how long to stop in case of emergency? 2 miles
How far do 2 pieces of standing equipment have to be away from one another in order for a
roadway worker to cross between them? 50 feet
, When should a roadway worker use the Good Faith Challenge? When they feel a directive
will violate an operating or safety rule
type of working limits on controlled track foul time, exclusive track occupancy
type of working limits on non-controlled track inaccessible track
type of train approach warning watchman
type of train approach warning individual train detection
What type of work roadway workers do? inspection and construction of track, maintenance
of bridges, repair of signal and communication systems, repair of RMM
Can fouling a track apply to both people and machinery? Yes
Within what distance to the track is a roadway worker considered fouling it? 4 feet from the
nearest running rail
Who authorizes movements on controlled track? Operator/Dispatcher
The RWIC is required to be qualified on physical characteristics when their group is working
on.... All tracks
The EIC is an employee who is in charge of.... A work group