U1 UST Installation/Retrofitting Newest 2025 Complete Questions And Correct Answers
(Verified Answers) |Already Graded A+
1. One of the significant causes of leaks in underground liquid storage systems is ____________
________________ - (answer)Improper Installation
2. Written Plans are required to - (answer)obtain permits, solicit bids, and provide precise guidance for
installers.
3. The plans should - (answer)Describe the property, identify the size and location of the tanks, indicate
the liquids to be stored and provide the location of the dispensers and piping.
4. Storage systems discussed in this recommended practice are usually regulated by - (answer)Federal,
state or local agencies.
5. All owners should ensure that the equipment to be installed meets - (answer)applicable regulatory
requirements before being installed
6. Consult the local authorities who have jurisdiction in the area before storage-system plans are -
(answer)finalized or construction is initiated.
7. All owners should ensure that the equipment to be installed meets all applicable regulatory
requirements before - (answer)Being installed.
8. To avoid damage tanks must not be - (answer)dropped, dragged, or handled with sharp objects.
9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid - (answer)Damage to the
tank
10. The only time tanks really should be moved is when - (answer)for inspections and testing.
,U1 UST Installation/Retrofitting Newest 2025 Complete Questions And Correct Answers
(Verified Answers) |Already Graded A+
11. If a tanks is damaged at all throughout the moving process it must be - (answer)Repaired in
accordance with the manufacture's instructions.
12. The proper way to move a tank is by lifting it, using the - (answer)Lift lugs that are installed by the
manufacturer.
13. Tanks should be carefully lifted and lowered using - (answer)Cables or chains of adequate length.
14. When two lifting lugs are being used, the angle between the lifting cable and vertical should be no
more than - (answer)30 degrees.
15. Stockpile piping materials and equipment in a _____________ _________ on the job site -
(answer)Secure area
16. Confirm adherence to specifications by reporting to the owner about any - (answer)detected
damage that could result in leakage or premature corrosion.
17. Pressure test single-walled tanks with _____ to _______ psig air pressure, soaping all surfaces,
seams and fittings while inspecting for bubbles. - (answer)3 to 5
18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is hazardous and may damage
the tank - (answer)5 psig
19. Do not air test a tank that has previously contained - (answer)flammable or combustible liquids
20. Place ______ barricades at the ends of tanks being tested. - (answer)Warning
21. Avoid tank ends, man-ways, and fittings while the tank is under - (answer)Pressure
, U1 UST Installation/Retrofitting Newest 2025 Complete Questions And Correct Answers
(Verified Answers) |Already Graded A+
22. Release pressure in the tank before disconnecting any - (answer)gauges or test fittings.
23. Be aware some manufactures do not tighten fittings to allow for _____________ _____________
during shipping and storage. - (answer)Temperature changes
24. True or False: Air tests are inconclusive without soaping and careful inspection for bubbles? -
(answer)True
25. Tanks gauges must have a scale that will permit detection of small changes in __________ that might
go undetected on gauges with a ___________ _________. - (answer)Pressure, broader range.
26. Since the best accuracy of gauges is at mid-range, and test pressures must not exeed 5 psig, use a
gauge with a maximum limit of ____ or ______ - (answer)10 or 15 psig
27. Check the gauges __________ and _________ before use - (answer)operation and accuracy
28. Underground storage systems may include vapor-recovery - (answer)Piping and equipment
29. What can cause premature storage-system failures _________ - (answer)Debris and other foreign
materials
30. Tank installers should have gone through training programs to improve their skills and insure the
install is __________ - (answer)Successful
31. __________ kinds of plans are required to obtain permits, solicit bids, and provide precise guidance
for installers - (answer)written
(Verified Answers) |Already Graded A+
1. One of the significant causes of leaks in underground liquid storage systems is ____________
________________ - (answer)Improper Installation
2. Written Plans are required to - (answer)obtain permits, solicit bids, and provide precise guidance for
installers.
3. The plans should - (answer)Describe the property, identify the size and location of the tanks, indicate
the liquids to be stored and provide the location of the dispensers and piping.
4. Storage systems discussed in this recommended practice are usually regulated by - (answer)Federal,
state or local agencies.
5. All owners should ensure that the equipment to be installed meets - (answer)applicable regulatory
requirements before being installed
6. Consult the local authorities who have jurisdiction in the area before storage-system plans are -
(answer)finalized or construction is initiated.
7. All owners should ensure that the equipment to be installed meets all applicable regulatory
requirements before - (answer)Being installed.
8. To avoid damage tanks must not be - (answer)dropped, dragged, or handled with sharp objects.
9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid - (answer)Damage to the
tank
10. The only time tanks really should be moved is when - (answer)for inspections and testing.
,U1 UST Installation/Retrofitting Newest 2025 Complete Questions And Correct Answers
(Verified Answers) |Already Graded A+
11. If a tanks is damaged at all throughout the moving process it must be - (answer)Repaired in
accordance with the manufacture's instructions.
12. The proper way to move a tank is by lifting it, using the - (answer)Lift lugs that are installed by the
manufacturer.
13. Tanks should be carefully lifted and lowered using - (answer)Cables or chains of adequate length.
14. When two lifting lugs are being used, the angle between the lifting cable and vertical should be no
more than - (answer)30 degrees.
15. Stockpile piping materials and equipment in a _____________ _________ on the job site -
(answer)Secure area
16. Confirm adherence to specifications by reporting to the owner about any - (answer)detected
damage that could result in leakage or premature corrosion.
17. Pressure test single-walled tanks with _____ to _______ psig air pressure, soaping all surfaces,
seams and fittings while inspecting for bubbles. - (answer)3 to 5
18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is hazardous and may damage
the tank - (answer)5 psig
19. Do not air test a tank that has previously contained - (answer)flammable or combustible liquids
20. Place ______ barricades at the ends of tanks being tested. - (answer)Warning
21. Avoid tank ends, man-ways, and fittings while the tank is under - (answer)Pressure
, U1 UST Installation/Retrofitting Newest 2025 Complete Questions And Correct Answers
(Verified Answers) |Already Graded A+
22. Release pressure in the tank before disconnecting any - (answer)gauges or test fittings.
23. Be aware some manufactures do not tighten fittings to allow for _____________ _____________
during shipping and storage. - (answer)Temperature changes
24. True or False: Air tests are inconclusive without soaping and careful inspection for bubbles? -
(answer)True
25. Tanks gauges must have a scale that will permit detection of small changes in __________ that might
go undetected on gauges with a ___________ _________. - (answer)Pressure, broader range.
26. Since the best accuracy of gauges is at mid-range, and test pressures must not exeed 5 psig, use a
gauge with a maximum limit of ____ or ______ - (answer)10 or 15 psig
27. Check the gauges __________ and _________ before use - (answer)operation and accuracy
28. Underground storage systems may include vapor-recovery - (answer)Piping and equipment
29. What can cause premature storage-system failures _________ - (answer)Debris and other foreign
materials
30. Tank installers should have gone through training programs to improve their skills and insure the
install is __________ - (answer)Successful
31. __________ kinds of plans are required to obtain permits, solicit bids, and provide precise guidance
for installers - (answer)written