• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 35 pages
Exam (elaborations)

ARE 5.0 (PjM/ PcM/ PA/ PPD/ PDD/ CE): Project Budget/ Financial UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 4 out of 35 pages

ARE 5.0 (PjM/ PcM/ PA/ PPD/ PDD/ CE): Project Budget/ Financial UPDATED ACTUAL Exam Questions and CORRECT Answers

Content preview

ARE 5.0 (PjM/ PcM/ PA/ PPD/
PDD/ CE): Project Budget/
Financial UPDATED ACTUAL Exam
Questions and CORRECT Answers

Save




Terms in this set (120)


Projected financial statements of
future values: expected project
generated income vs. expected
Pro Forma project building costs.
- Developed in order to determine
whether the project is likely to be
financially successful.

, - Scope (Project size)
Bldg. cost
- Quality
factor
- Construction Cost

- Quality: quality level of
materials/ systems/ construction
- Quantity
- Funds
Bldg. cost - Time
variable - Location (urban/ rural): labor
factors? rates/ material prices/
transportation
(One cannot be changed without
changing one or more of the
others)

- Perimeter-to-floor area =
increase unit cost
Scope vs. Cost - Floor-to-floor height = increase
unit cost
- Taller bldg. = increase unit cost

, Labor cost = 50% of construction
cost
- Longer schedule = increase
construction/ labor cost
- Higher Labor cost = decrease
Productivity
Cost vs. Time

Method:
- shorten schedule: fast-track
- Increase off-site manufacturing =
decrease on-site labor cost/
erection time

- Higher quality = higher initial cost
= higher efficient = longer life span
Quality vs. Life
- Longer life span = lower
cycle
operational cost = decrease
maintenance/ replacement cost

Scope
(Architect sets) Most realistic and accurate way to
Project Budget establish a preliminary budget,
based on because it is based on a specific
_________ building type of a defined size on a
specific site.

, The sum established by the owner
as available for the entire project
Project Budget
on hard cost & soft cost
(Cost analysis)
- Influence design decision &
project feasibility

Document information

Uploaded on
June 28, 2025
Number of pages
35
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$16.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Cluster25j
5.0
(270)
Sold
1933
Followers
1
Items
1104
Last sold
5 days ago

Reviews from verified buyers




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions