What type of work do Roadway Workers do?
A.) Inspection and construction of railroad track
B.) Maintenance of bridges.
C.) Repair of signal and communication systems.
D.) Repair of roadway maintenance machinery.
E.) All of the Above - CORRECT ANSWER E.) All of the Above
Within what distance to the track is a Roadway Worker considered fouling it?
A.) 4 feet from the nearest running rail
B.) 4 feet from centerline
C.) 4 feet from the edge of the tie
D.) 4 feet from the far running rail - CORRECT ANSWER A.) 4 Feet from the Nearest Running Rail
A _________ authorizes movements on controlled track
A.) RWIC
B.) Foreman
C.) Operator/Dispatcher
D.) Trainmaster - CORRECT ANSWER C.) Operator/Dispatcher
The RWIC is required to be qualified on physical characteristics when their group is working on
________
A.) Only on controlled track
B.) Only on non-controlled track
, C.) All tracks
D.) Adjacent controlled tracks - CORRECT ANSWER C.) All Tracks
The Employee in Charge (EIC) is an employee who is in charge of __________
A.) The movement of trains
B.) A work group
C.) 3 or more blocks of track
D.) A train station - CORRECT ANSWER B.) A work Group
The main role of the RWIC is _________
A.) To provide warning of approaching trains
B.) To ensure all employees arrive to work on time
C.) To establish on track safety
D.) To oversee the work being done - CORRECT ANSWER C.) To Establish on Track Safety
When can personal electronic devices be used while on duty?
A.) When a family member calls with an emergency
B.) When on track safety has been established
C.) If there is an emergency at the job site and no other forms of communication are available
D.) If the employee is an RWIC - CORRECT ANSWER C.) If there is an emergency at the job site and no
other forms of communication are available
How is a job briefing documented?
A.) NRPC 4104
B.) In the RWIC's log book