ICC / UST Exam 2025 LATEST EXAM
QUESTIONS AND VERIFIED ANSWERS GRADED
A+ ASSURED SUCCESS
Save
Quick quiz
Learn 1 /7 Study with Learn
designs and certifies cathodic protection system
Choose matching term
Interior lining must be inspected by
1 Corrosion Specialist 2 a coating expert within ____years of
installation
Designated operator must conduct Date that all UDC upgrades shall
3 4
inspections of UST every____ be completed
Don't know?
Terms in this set (40)
, Corrosion Specialist designs and certifies cathodic protection system
Secondary containment A. 100% of usable capacity of primary where there is
shall be constructed to only one primary is within the secondary
contain at least the B. 150% of the largest container if there are multiple
following volumes: primary containers in a single secondary
Cathodic protection 6 months
tester will test cathodic
protection system within 3 years
__ months of installation
and every __ years
thereafter
A. If made of metal, exterior wall shall be protected
from galvanic corrosion
Spill container shall meet
B. Shall have minimum capacity of 5 gallons (19 L)
the following
C. Shall have drain valve which allows drainage of
requirements:
the collected spill into the primary container or
provide means to keep spill cont empty
Overfill prevention shall 90%
alert transfer operator
when tank is __% full
Flapper Valves shall 95%
provide positive shut off
when tank is filled to no
more than __% capacity
Primary pressurized 150%
piping shall be tested for
tightness hydrostatically
at __% of design
operating pressure
Date that all UST systems November 9,2004
must have Line Leak
Detector installed
QUESTIONS AND VERIFIED ANSWERS GRADED
A+ ASSURED SUCCESS
Save
Quick quiz
Learn 1 /7 Study with Learn
designs and certifies cathodic protection system
Choose matching term
Interior lining must be inspected by
1 Corrosion Specialist 2 a coating expert within ____years of
installation
Designated operator must conduct Date that all UDC upgrades shall
3 4
inspections of UST every____ be completed
Don't know?
Terms in this set (40)
, Corrosion Specialist designs and certifies cathodic protection system
Secondary containment A. 100% of usable capacity of primary where there is
shall be constructed to only one primary is within the secondary
contain at least the B. 150% of the largest container if there are multiple
following volumes: primary containers in a single secondary
Cathodic protection 6 months
tester will test cathodic
protection system within 3 years
__ months of installation
and every __ years
thereafter
A. If made of metal, exterior wall shall be protected
from galvanic corrosion
Spill container shall meet
B. Shall have minimum capacity of 5 gallons (19 L)
the following
C. Shall have drain valve which allows drainage of
requirements:
the collected spill into the primary container or
provide means to keep spill cont empty
Overfill prevention shall 90%
alert transfer operator
when tank is __% full
Flapper Valves shall 95%
provide positive shut off
when tank is filled to no
more than __% capacity
Primary pressurized 150%
piping shall be tested for
tightness hydrostatically
at __% of design
operating pressure
Date that all UST systems November 9,2004
must have Line Leak
Detector installed