Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

ARE 5.0 Programming & Analysis - Brightwood Glossary (S-Z) UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 2 out of 9 pages

ARE 5.0 Programming & Analysis - Brightwood Glossary (S-Z) UPDATED ACTUAL Exam Questions and CORRECT Answers sample - CORRECT ANSWER - Material or assembly submitted for the architect's approval prior to manufacture or delivery to the project. satellite - CORRECT ANSWER importance, dependent on a larger city. scale - CORRECT ANSWER - In urban planning, an outlying community of secondary - The relative measurement of an object, with reference to the dimensions of the human body

Content preview

ARE 5.0 Programming & Analysis -
Brightwood Glossary (S-Z) UPDATED
ACTUAL Exam Questions and CORRECT
Answers
sample - CORRECT ANSWER - Material or assembly submitted for the architect's
approval prior to manufacture or delivery to the project.


satellite - CORRECT ANSWER - In urban planning, an outlying community of secondary
importance, dependent on a larger city.


scale - CORRECT ANSWER - The relative measurement of an object, with reference to
the dimensions of the human body.


schedule of values - CORRECT ANSWER - A statement furnished to the architect by the
contractor reflecting the amounts to be allotted for the principal divisions of the work. It serves
as a guide for reviewing the contractor's periodic applications for payment.


separate prime contract - CORRECT ANSWER - One of several owner-contractor
agreements for a project, each of which provides for constructing a major portion of the work
(general construction, electrical, mechanical, etc.) by a different contract.


septic system - CORRECT ANSWER - sewage treatment system consisting of a tank and
filtering system.


setback - CORRECT ANSWER - A legally defined distance from the property line into
which a structure may not project.


sewer - CORRECT ANSWER - An underground pipe or drain used to carry off rain water
(storm sewer) or waste matter (sanitary sewer).

, sheeting - CORRECT ANSWER - A thin layer of water moving across a surface, also
called sheet flow.


shop drawings - CORRECT ANSWER - Drawings prepared by the contractor,
subcontractor, manufacturer, or supplier, showing how specific portions of the work shall be
fabricated and/or installed.


sick building syndrome - CORRECT ANSWER - A term used to describe poor indoor air
quality, which can lead to discomfort and possibly disease.


side yard - CORRECT ANSWER - The minimum legal distance between side property
lines and a structure.


silt - CORRECT ANSWER - A fine-grained soil whose particles are 0.05 to 0.002
millimeters in diameter.


single prime contract - CORRECT ANSWER - A contract for building construction under
which one prime contractor is responsible for the entire project, in contrast to having separate
contracts.


site planning - CORRECT ANSWER - Designing the external physical environment in
which buildings and structures are placed.


slope - CORRECT ANSWER - The amount of deviation from the horizontal or vertical.



sludge - CORRECT ANSWER - Accumulated solids that settle out of the sewage, forming
a semi-liquid mass on the bottom of a septic tank.


slum - CORRECT ANSWER - An urban area that is overcrowded and whose buildings
may be unsafe and unhealthful to inhabit.

Document information

Uploaded on
June 24, 2025
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES
4.0
(235)
Sold
1538
Followers
108
Items
110360
Last sold
1 day ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions