Questions and CORRECT Answers
1.Who is essentially responsible for the quality of a product?
A. Customer
B. QA Manager
C. Development Manager
D. Test Manager - CORRECT ANSWER -C
2.What is the purpose of exit criteria?
Select one:
a. To identify when a software system should be retired.
b. To determine whether a test has passed.
c. To determine when a test has completed.
d. To define when a test level is complete. - CORRECT ANSWER -D
3. What is the MAIN benefit of designing tests early in the life cycle?
A. It is cheaper than designing tests during the test phases.
B. It helps prevent defects from being introduced into the code.
C. Tests designed early are more effective than tests designed later.
D. It saves time during the testing phases when testers are busy. - CORRECT ANSWER -
B
4.Testing where in we subject the target of the test , to varying workloads to measure and
evaluate the performance behaviors and ability of the target and of the test to continue to
function properly under these different workloads.
A. Load Testing
B. Integration Testing
C. System Testing
, D. Usability Testing - CORRECT ANSWER -A
5. Which of the following statements are true?
A. Faults in program specifications are the most expensive to fix.
B. Faults in code are the most expensive to fix.
C. Faults in requirements are the most expensive to fix
D. Faults in designs are the most expensive to fix. - CORRECT ANSWER -C
6.Defects are least costly as what stage of Development cycle.
A. Analysis and Design
B. Construction
C. Requirements
D. Implementation - CORRECT ANSWER -C
7. The cost of fixing a fault:
A. can never be determined
B. increases the later a fault is found
C. decreases the later a fault is found
D. is not important - CORRECT ANSWER -B
8. _________must be developed to describe when and how testing will occur.
A. Test Design
B. Test Case
C. Test Strategy
D. Test Plan - CORRECT ANSWER -C
9. _________must be developed to describe when and how testing will occur.
A. Test Design