1. REC log
2. REC form
3. REC Continuation Page
4. REC Continuation Rework Page
5. Test and Inspection Cover Page
6. Controlled Assembly Report Page 1 and 2
7. Joint Tightness Test
8. Valve Seat Tightness Test
9. Hydrostatic/Pneumatic Test
10. System Drop Test
11. DFS Log
12. DFS Report
13. DFS Clearance Sheet - ANS Name 13 REC forms
System, Issue/Open/Close, Remarks, Signatures - ANS REC Log
Work Description Including Boundaries, Approval for Re-Entry into the System, REC complete
signatures - ANS REC form
References, Enclosures, Parts/Materials, Precautions/Prerequisites - ANS REC continuation
page
COPYRIGHT © 2025 BRAINBARTER ALL RIGHTS RESERVED 1
, Description of Items, Description of Test, Results, Whos Performing Test - ANS Test and
Inspection Cover Page
Required Test Pressure, Joint ID, SAT/UNSAT - ANS Joint Tightness Test
Test Media, Valve #, SAT/UNSAT - ANS Valve Seat Tightness Test
Required Test Points, Date of Test, Required Test Pressure, SAT/UNSAT -
ANS Hydrostatic/Pneumatic Test
Gauge Range, Duration of Test, Allowable System Drop, SAT/UNSAT - ANS System Drop Test
System, Major or Minor, Permanent or Temporary - ANS DFS Log
Major or Minor, Temporary or Permanent, Tech Drawings, CO Approval and Signature -
ANS DFS Report
Subject, Justification, Clear or Cancel, Signed by SCA - ANS DFS Clearance
REC Supervisor/Senior Diving Supervisor - ANS Who opens a REC?
REC Supervisor/Senior Diving Supervisor/CO Representative - ANS Who closes a REC?
At initial install, major overhaul, or system exceeds operational limits - ANS When is a system
certified/re-certified?
Surface- 2 Years